CUSTOMER STORY: Lanzhou Port Supercharges Container Efficiency with Henan Mine RMG
Project Location: Lanzhou International Port Area, China
Product Supplied: Rail Mounted Container Gantry Crane (RMG)
Crane Configuration:
Capacity: Custom heavy-load
Work Duty: A8 (24/7 full-load operation)
Features: Unmanned operation, intelligent monitoring, rapid fault diagnosis
Client Challenge
As a key hub on the Silk Road Economic Belt, Lanzhou International Port Area faced mounting pressure to handle a growing volume of rail–container intermodal traffic linking Central Asia, West Asia, and Europe. Their original gantry cranes struggled with:
Limited lifting efficiency during peak periods
Mechanical fatigue under year-round, all-weather usage
Manual operation bottlenecks causing slow turnaround
Reactive maintenance and lack of remote diagnostics
With rising demand and the urgency to streamline logistics, the client required a high-speed, highly reliable, and automated crane system that could operate 24/7, regardless of season or workload.
Henan Mine's Tailored Solution
Henan Mine designed and delivered a fully customized RMG crane engineered to meet A8-level heavy-duty working conditions, with the following innovations:
Ultra-Fast Operation
Lifting speed and trolley speed significantly enhanced
+50% lifting efficiency compared to traditional U-frame gantry cranes
Stable & Durable Performance
Precision motion system ensures smooth running, reducing alternating load shocks
Mechanical wear minimized, leading to extended equipment lifespan
All-Season, 24/7 Readiness
Designed for extreme weather and continuous operation
Rugged structure and enclosure resist wind, rain, dust, and temperature extremes
Unmanned Operation & Real-Time Monitoring
Fully automated control with remote dashboard and CMS system
Supports real-time fault detection and instant diagnostics, reducing downtime by 40%
Result: Operational Breakthrough at Lanzhou Port
Container handling throughput increased dramatically
Real-time data visibility empowered smarter logistics coordination
Fewer maintenance interruptions thanks to predictive diagnostics
Cut crane cycle time, enabling faster train turnarounds and port fluidity
Client Feedback:
“This crane changed our entire operational tempo. It works around the clock, doesn’t break down, and helps us keep up with the increasing demands of the Eurasian corridor.”
Fill in the form below to get instant access to the cranes catalogue and speak to our technical team for recoomendations