Skip to content
CRANE MANUFACTURER SINCE 2002
info@hnksglobal.com+86 188 3620 7779Project enquiry ↗
Henan Mine Crane Request a quote
HENAN MINE CRANE / WIRE ROPE ELECTRIC HOISTS

KS1 Low-Headroom Wire Rope Hoist

Use more of the building's available lifting height.

KS1 places the motor and drum in a compact arrangement that reduces the hoist's installed height and brings the upper hook position closer to the supporting structure. Suspended and trolley-mounted layouts are available.

KS1Model designationProject-matchedRated load selection
KS1 low-headroom wire rope electric hoist with compact motor and drum arrangementPRODUCT CONFIGURATION / KS1
THE LIFTING TASK

Designed for your handling path.

KS1 places the motor and drum in a compact arrangement that reduces the hoist's installed height and brings the upper hook position closer to the supporting structure. Suspended and trolley-mounted layouts are available.

01 / APPLICATION

Where it fits

Low buildings, crane retrofits and production lines with tall equipment.

02 / EQUIPMENT

Crane arrangement

Wire Rope Electric Hoists.

MODEL KS1

Technical configuration

Size the crane against the load, installation geometry and work cycle. The final equipment schedule follows the project drawings and operating brief.

Rated loadSelected for the complete suspended load
Lifting heightSet from the lowest pickup point to the highest delivery position
HeadroomLow-headroom layout; final upper hook position to be dimensioned
MountingSuspended or trolley-mounted configuration
Hoisting motionSpeed selected for the lifting cycle
TravelBeam and trolley interface matched to the support structure
Work dutySet from actual operating frequency and load spectrum
Power and controlMatched to site supply and operator position
BUYER'S SELECTION GUIDE

Specify the crane around the job.

Low buildings, crane retrofits and production lines with tall equipment.

Compare the Wire Rope Electric Hoists range ↗
01

Load and lifting attachment

Share the maximum lifted mass, load dimensions, center of gravity and any grab, magnet, spreader or lifting beam.

02

Mounting and hook travel

Confirm beam or trolley dimensions, available headroom and required hook travel.

03

Duty and controls

State typical load, lifts per hour, travel distance, shifts, control position and site power supply.

04

Model-specific check

Provide the beam elevation, roof obstructions and highest required hook position.

TALK TO OUR ENGINEERS

Get a KS1 crane proposal.

Send the load schedule and site drawings. We can configure the crane, lifting system and installation interface for your operating conditions.

Request a technical proposal ↗
  • Maximum lifted load and attachment
  • Mounting beam and hook travel
  • Daily lifting cycle and control choice
  • Power supply, environment and destination