Skip to content
CRANE MANUFACTURER SINCE 2002
info@cranehenanmine.com+86 188 3620 7779Project enquiry ↗
Henan Mine Crane Request a quote
HENAN MINE CRANE / GANTRY CRANES

MGC Subway Slag Double-Girder Gantry Crane

The MGC subway-slag gantry crane handles deep-shaft spoil lifting, loaded bucket transfer and controlled overturning at metro and tunnel sites.

The MGC subway-slag gantry crane handles deep-shaft spoil lifting, loaded bucket transfer and controlled overturning at metro and tunnel sites. Specify the loaded bucket mass, below-rail hook travel, discharge orientation and relocation needs together.

MGCModel designationProject-matchedRated load selection
MGC Subway Slag Double-Girder Gantry CranePRODUCT CONFIGURATION / MGC
THE LIFTING TASK

Designed for your handling path.

The MGC subway-slag gantry crane handles deep-shaft spoil lifting, loaded bucket transfer and controlled overturning at metro and tunnel sites. Specify the loaded bucket mass, below-rail hook travel, discharge orientation and relocation needs together.

Confirm maximum suspended load, rail centers, travel length, cantilever, foundation reactions and outdoor wind conditions.

01 / APPLICATION

Where it fits

The MGC subway-slag gantry crane handles deep-shaft spoil lifting, loaded bucket transfer and controlled overturning at metro and tunnel sites. Specify the loaded bucket mass, below-rail hook travel, discharge orientation and relocation needs together.

02 / EQUIPMENT

Crane arrangement

Gantry Cranes.

MODEL MGC

Technical configuration

Size the crane against the load, installation geometry and work cycle. The final equipment schedule follows the project drawings and operating brief.

Type-Test ModelMGC
Type-Test ProductGeneral Gantry Crane
Typical Capacity45–50 t in the product range
Maximum Lifting HeightUp to 100 m
DutyHeavy-duty construction service
Primary ProcessTunnel spoil lifting, transfer, overturning and segment handling
Trolley Function180° trolley rotation available to adjust discharge direction
Crane Travel8-wheel / 4-drive arrangement
Outdoor SafetyWind rail clamp + anchoring device
Variable SpanCan be configured for changing construction locations
SafetyOverload protection, travel limits, buffers and wind protection
BUYER'S SELECTION GUIDE

Specify the crane around the job.

The MGC subway-slag gantry crane handles deep-shaft spoil lifting, loaded bucket transfer and controlled overturning at metro and tunnel sites. Specify the loaded bucket mass, below-rail hook travel, discharge orientation and relocation needs together.

Compare the Gantry Cranes range ↗
01

Load and lifting attachment

Share the maximum lifted mass, load dimensions, center of gravity and any grab, magnet, spreader or lifting beam.

02

Rails and working envelope

Confirm rail gauge, runway length, foundation capacity, cantilever and end approaches.

03

Duty and controls

State typical load, lifts per hour, travel distance, shifts, control position and site power supply.

04

Model-specific check

Confirm maximum suspended load, rail centers, travel length, cantilever, foundation reactions and outdoor wind conditions.

TALK TO OUR ENGINEERS

Get a MGC crane proposal.

Send the load schedule and site drawings. We can configure the crane, lifting system and installation interface for your operating conditions.

Request a technical proposal ↗
  • Maximum lifted load and attachment
  • Span, travel length and available clearances
  • Daily lifting cycle and control choice
  • Power supply, environment and destination