Skip to content
CRANE MANUFACTURER SINCE 2002
info@cranehenanmine.com+86 188 3620 7779Project enquiry ↗
Get a project quote
Home/Case studies/Energy, Hydropower & Utilities/600 t Synchronized Dual-Hook Crane for a Pumped-Storage Project
PROJECT CASE / ENERGY, HYDROPOWER & UTILITIES

600 t Synchronized Dual-Hook Crane for a Pumped-Storage Project

A 600 t overhead crane combines high-strength steel, synchronized hooks, anti-sway and digital monitoring for powerhouse lifting.

Heavy lifting crane prepared for pumped-storage equipment handling
Heavy lifting crane prepared for pumped-storage equipment handling.
INDUSTRYEnergy, Hydropower & Utilities
LOCATIONChina
Rated capacity600 t
PROJECT STAGEProject equipment supply
01 / PROJECT CONTEXT

The project and its handling task.

Henan Mine Crane supplied a batch of crane equipment for a pumped-storage station project within an energy infrastructure programme. The named 600 t overhead crane provides heavy lifting capacity for the project’s equipment-handling requirements.

The crane uses high-strength steel and internationally branded major components. High-precision dual-hook synchronization, intelligent anti-sway and digital monitoring coordinate the suspended load during heavy lifts. This case focuses on the lifting and monitoring configuration of the powerhouse equipment.

02 / HANDLING REQUIREMENTS

Preserve heavy-component access after the station is commissioned.

The biggest generating component must be installable at construction and removable for overhaul years later; lost crane clearance creates a long-term maintenance problem.

Overhaul component schedule

Identify the components that will need periodic extraction.

Future rigging mass

Check hook coverage from unit pit to laydown area.

Unit-pit and laydown geometry

Set inspection and test intervals for infrequent critical lifts.

Long-term inspection plan

Set inspection and test intervals for infrequent critical lifts.

Heavy lifting crane prepared for pumped-storage equipment handling
Heavy lifting crane prepared for pumped-storage equipment handling.
03 / SUPPLIED SYSTEM

The equipment behind this project.

The crane uses high-strength steel and internationally branded major components. High-precision dual-hook synchronization, intelligent anti-sway and digital monitoring coordinate the suspended load during heavy lifts. This case focuses on the lifting and monitoring configuration of the powerhouse equipment.

  • Rated capacity600 t
  • Structure materialHigh-strength steel
  • Major componentsInternationally branded components
  • Lifting coordinationHigh-precision dual-hook synchronization
  • Protection and supervisionIntelligent anti-sway and digital monitoring
Explore the application solution ↗
04 / ENGINEERING DECISIONS

What to compare with your own project.

Match the project configuration to your load, layout and operating sequence before selecting a crane package.

Design areaThis project configurationDefine for your site
Rated capacity600 tOverhaul component schedule. Define the required operating envelope and acceptance checks in your technical brief.
Structure materialHigh-strength steelFuture rigging mass. Define the required operating envelope and acceptance checks in your technical brief.
Major componentsInternationally branded componentsUnit-pit and laydown geometry. Define the required operating envelope and acceptance checks in your technical brief.
Lifting coordinationHigh-precision dual-hook synchronizationLong-term inspection plan. Define the required operating envelope and acceptance checks in your technical brief.
Protection and supervisionIntelligent anti-sway and digital monitoringOverhaul component schedule. Define the required operating envelope and acceptance checks in your technical brief.
05 / PROJECT PHOTOGRAPHS

See the equipment and working environment.

Explore the equipment arrangement and handling environment.

06 / PROJECT OUTCOME

Project equipment supply.

The crane was supplied as part of the pumped-storage project’s equipment programme. Synchronized hooks and monitored movement address the coordination needed for large powerhouse loads.

For a similar project, plan the 600 t powerhouse crane against both initial installation and future extraction. Dual-hook synchronization, anti-sway and monitoring support controlled moves, while the building design must retain laydown and service space.

07 / PLAN A SIMILAR PROJECT

Prepare a comparable crane quotation.

Share the load schedule and site drawings. Plan the 600 t powerhouse crane against both initial installation and future extraction. Dual-hook synchronization, anti-sway and monitoring support controlled moves, while the building design must retain laydown and service space.

We can quote a single crane or a coordinated fleet. The offer sets out the destination standards, required certificates and inspection records, manufacturing programme after drawing approval, shipment, installation support and agreed acceptance scope.

  1. Overhaul component schedule
  2. Future rigging mass
  3. Unit-pit and laydown geometry
  4. Long-term inspection plan
  5. Destination standards, quantity and inspection documentation
  6. Manufacturing programme, shipment, commissioning, training and spares
BUYER QUESTIONS

Questions before specifying a similar crane.

Can the same project crane be supplied for my site?

We customize the capacity, span, lifting height, attachment and controls to the load, building or yard layout and operating cycle. Overhaul component schedule is one of the inputs to review before final equipment selection.

How are certification, quantity and lead time agreed?

Single-crane and fleet enquiries are welcome. Define the destination and required standards in the enquiry. The project offer confirms certification and inspection documents, the quantity, drawing approval and manufacturing schedule, with the shipping and site-service boundaries.

What should acceptance and after-sales support include?

Agree the inspection plan, representative load and functional tests, operator training, maintenance instructions, spare-parts scope and fault-recovery procedures. For this application, include long-term inspection plan in the technical review.

ENERGY, HYDROPOWER & UTILITIES PROJECT ENQUIRY

Planning a similar lifting project?

Send your layout, load and operating requirements. We can develop a customized crane package and delivery scope for your site.

Request a technical proposal ↗