Overhaul component schedule
600 t Pumped-Storage Crane with Synchronized Dual-Hook Lifting
The biggest generating component must be installable at construction and removable for overhaul years later; lost crane clearance creates a long-term maintenance problem.

Start with the component and the lift route.
The biggest generating component must be installable at construction and removable for overhaul years later; lost crane clearance creates a long-term maintenance problem.
The lifted component, rigging, building clearances and control sequence need to be reviewed as one operating system.
Prepare the technical brief ↗Future rigging mass
Unit-pit and laydown geometry
Long-term inspection plan
Preserve heavy-component access after the station is commissioned.
Plan the 600 t powerhouse crane against both initial installation and future extraction. Dual-hook synchronization, anti-sway and monitoring support controlled moves, while the building design must retain laydown and service space.

Plan future removal
Identify the components that will need periodic extraction.
Trace the lift route
Check hook coverage from unit pit to laydown area.
Maintain readiness
Set inspection and test intervals for infrequent critical lifts.
Lifecycle capacity
Include replacement and rigging scenarios in the original design brief.
Building access
Protect doorways, overhead clearance and runway service points.
National pumped-storage project follow-up
A 600 t bridge crane for a national pumped-storage project incorporated synchronized hooks, anti-sway and digital monitoring.


Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Overhaul component schedule | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Future rigging mass | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Unit-pit and laydown geometry | Duty classification, speeds and control behaviour matched to the agreed operating cycle. |
| 04 / Site requirement | Long-term inspection plan | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane be configured for our powerhouse or factory?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.