Map the zones
Mark scrap receipt, ladle travel, slab transfer and finished-product storage on one site plan.
A large steel plant has separate scrap, melt-shop and finished-product routes; a single crane specification cannot cover every load.
Henan Mine Crane equipment for Southeast Asian integrated steel plant
A large steel plant has separate scrap, melt-shop and finished-product routes; a single crane specification cannot cover every load.
Zone the plant by material and duty. Use dedicated ladle handling in hot areas, clamps or magnetic beams for formed steel, and gantry capacity at the port scrap yard. Align transfer points and runway interfaces before choosing models.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Mark scrap receipt, ladle travel, slab transfer and finished-product storage on one site plan.
Specify hooks, clamps, magnetic beams or grabs against the material at each pickup point.
Coordinate bay coverage, yard access and vehicle movements where routes meet.
These choices affect safety, process fit and the operating life of the installation.
A filled ladle calls for its own safety and operating review, including the lifting gear mass.
Use actual shifts and handling cycles for each bay instead of applying one plant-wide capacity.
See how cranes and lifting systems were configured for demanding operating environments.

Henan Mine Crane supplied more than 100 lifting systems, including a 160 t double-girder bridge crane, slab-clamp cranes, lower-rotating magnetic-beam cranes and double-trolley gantries for a port scrap yard.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.

Four-girder control for extra-heavy steel ladles.
Review product details ↗
Secure slab transfer from casting line to storage.
Review product details ↗
Turn the magnetic beam below the lifting trolley.
Review product details ↗
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗