Container and mixed-cargo schedule
Luoyang Inland Port Cargo Transfer
An inland port must move containers precisely while accommodating other freight with different lifting attachments.

Start with the load and the process route.
An inland port must move containers precisely while accommodating other freight with different lifting attachments.
The load, lifting attachment, traffic interface and control sequence need to be reviewed as one operating system.
Prepare the technical brief ↗Rail gauge and lane layout
Attachment weights and interfaces
Traffic, positioning and recovery rules
Use one terminal lane for containers and other scheduled cargo.
Configure the rail-mounted gantry around truck and rail transfer lanes. Use variable-frequency travel, PLC control and anti-sway for container positioning; define interchangeable lifting gear and a verified changeover routine for other cargo.

Identify each load
Separate container jobs from loads needing another attachment.
Transfer through the yard
Coordinate trolley and gantry travel with vehicle routes.
Change and release
Verify the attachment, load path and set-down before the next task.
Mixed-cargo lifting
Check capacity and hook coverage in every attachment mode.
Terminal geometry
Confirm end approach, rail span and clearance at busy transfer points.
Dongfanghong Luoyang International Inland Port
Henan Mine Crane delivered a customized rail-mounted container gantry to the Luoyang inland port, with PLC control, anti-sway, an annular trolley and interchangeable lifting gear.




Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Container and mixed-cargo schedule | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Rail gauge and lane layout | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Attachment weights and interfaces | Attachment self-weight, rated-load basis, changeover procedure and mechanical/electrical interfaces. |
| 04 / Site requirement | Traffic, positioning and recovery rules | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane be customized for our site?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗
























