Mechanism Service-Duty Analysis

Turn an operating schedule into expected mechanism running hours over a defined service period.

Defined engineering modelWorked example includedFree to use
Before you start: required inputs
  • Choose one mechanism, such as hoisting or bridge travel, and obtain its actual on-time within the scheduled hours.
  • For cubic equivalent hours, obtain a time-weighted cubic coefficient consistent with that mechanism’s load definition.
1

Enter your values

Example values loaded
h/day
Daily scheduled operating window for the assessed mechanism or workstation.
min/h
Actual running minutes of this mechanism within each scheduled hour, including loaded and unloaded movement.
days/year
Annual days on which the entered schedule is expected to occur.
years
Length of the operating-history or planning period being assessed.
—
Cubic load coefficient weighted by actual mechanism running time, derived using the selected load model; it is not automatically the cycle-weighted indicator.
A PRACTICAL WALKTHROUGH

How to use this calculator

01

Describe the work schedule

Set working hours per day, working days per year and the period being assessed.

02

Separate running from attendance

Set how many minutes the selected mechanism actually runs in each scheduled hour.

03

Read total operating hours

Compare annual and service-period running time. Treat cubic equivalent hours as a separate weighted quantity.

WORKED EXAMPLE

Hoist running 15 minutes per scheduled hour

THE INPUTS

8 scheduled hours/day, 15 running minutes/hour, 250 days/year, 20 years and a time-weighted coefficient of 0.25.

THE RESULT

Annual running time is 500 h and service-period running time is 10,000 h. Cubic full-load-equivalent time is 2,500 h.

MAKE SENSE OF THE NUMBERS

What does the result mean?

01

On-time fraction describes the mechanism’s running share of scheduled hours.

02

Cubic equivalent hours depend on the entered time-weighted coefficient; they are not the same as actual clock hours.

03

ISO/FEM group, inspection interval and remaining safe working life require the applicable classification method and actual history.

Watch for this

Counting the full factory shift as hoist running time even while the hoist is stationary.

Formula & model conditions +

H_operating/year = hours/day × on-minutes/hour ÷ 60 × days/year

H_lifetime = H_operating/year × years

H_cubic-equivalent = k_time × H_lifetime

  • A constant schedule and on-time fraction are applied to the full assessed service period.
  • The cubic coefficient is supplied by the user and is weighted by mechanism operating time.
  • No ISO/FEM mechanism group, design working period, inspection interval or remaining safe life is automatically assigned.

Common questions

Why does this tool not output M1–M8?

Assigning a group requires the applicable standard definitions and classification procedure. This tool keeps the operating-time inputs and arithmetic visible instead.

Can I use one result for every crane mechanism?

Hoisting, trolley travel and bridge travel can have different running times and load histories. Assess each separately.

↗