Full assembly and rigging mass
750 t Heavy Fabrication Gantry
A 750 t yard lift can challenge wheel loads, travel control and power supply before the first component is moved.

Start with the load and the production route.
A 750 t yard lift can challenge wheel loads, travel control and power supply before the first component is moved.
The lifted load, rigging, building clearances and control sequence need to be reviewed as one operating system.
Prepare the technical brief ↗Civil and wheel-load limits
Lift-point spacing and route
Electrical supply and recovery plan
Move extremely heavy assemblies while managing runway pressure.
Coordinate the gantry, runway and supply system as one package. Multi-point synchronized lifting, monitored travel, a site-specific dual-rail arrangement and regenerative power are evaluated against the real lifting cycle.

Establish the heavy lift
Calculate assembly, rigging and support loads at each pickup point.
Move across the site
Balance lifting points and control gantry travel over the chosen rail layout.
Set down safely
Monitor load distribution and movement through final placement.
Runway pressure
Verify the single-side dual-rail arrangement against civil design and wheel loads.
Power and recovery
Check the 10 kV supply, regeneration and safe response to power interruption.
Zhejiang 750 t gantry project
The project used a 750 t double-girder gantry in service at a Zhejiang project, with synchronized multi-point lifting, a single-side dual-rail design and 10 kV power with energy recovery.




Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Full assembly and rigging mass | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Civil and wheel-load limits | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Lift-point spacing and route | Duty classification, speeds and control behaviour matched to the agreed operating cycle. |
| 04 / Site requirement | Electrical supply and recovery plan | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the lifting system be configured for our load and factory?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗






















