
Move extremely heavy assemblies while managing runway pressure.
A 750 t yard lift can challenge wheel loads, travel control and power supply before the first component is moved.
Coordinate the gantry, runway and supply system as one package. Multi-point synchronized lifting, monitored travel, a site-specific dual-rail arrangement and regenerative power are evaluated against the real lifting cycle.


























