MU Shipbuilding Gantry Crane
Lift, turn and position ship blocks across dock and slipway assembly areas.
All specifications
| Model | MU |
|---|---|
| Crane arrangement | Shipbuilding gantry on dock or slipway rails |
| Lifting attachment | Hook and ship-section lifting tools |
| Rated suspended load | Selected for the load, complete attachment and rigging |
| Span | Selected from the runway centres and required working coverage |
| Lifting height | Upper and lower pickup levels specified with attachment depth and headroom |
| Working class | Selected for the load spectrum, lifts per hour and shifts |
| Hoisting performance | Lifting and positioning speeds specified with the selected mechanism |
| Trolley travel | Travel speed, stopping control and hook approaches selected for the task |
| Crane travel | Speed, runway length and stopping positions specified for the working route |
| Operating controls | Operator position and controls selected for visibility and the process |
| Electrical supply | Site voltage, phases, frequency and power-feed arrangement specified in the offer |
| Rail and civil interface | Rail section, wheel reactions and supporting foundations selected together |
| Outdoor design | Site wind exposure, parking restraint and environmental protection specified where applicable |
| Clearance envelope | Load passage, access and maintenance clearances shown in the arrangement drawing |
| Supply scope | Crane equipment, rail work, installation and commissioning responsibilities agreed in the quotation |
| Girder layout | Single- or double-main-girder arrangement selected for the project |
| Control package | PLC and variable-frequency communication control |
| Safety monitoring | Data and video monitoring functions defined in the equipment scope |
| Multiple lifting points | Individual hook ratings, permitted combined loads and turning sequence specified in the lift plan |
| Supporting legs | Rigid and flexible leg arrangement matched to the selected gantry structure |
| Structural design | Principal load-bearing members analyzed for the ordered load cases and geometry |
| Motion buffering | Buffers and the hoisting/braking arrangement selected to control motion shocks |
| Separate shipbuilding references | Five reference configurations below; the offer confirms the ordered MU ratings and geometry. |
| Shipbuilding reference configurations — lifting and turning ratings | Reference schedules for initial comparison, not fixed MU packages. Hook ratings, combined lifts and turning ratings are separate. H1/H2 dimensions, usable hook travel, wheel reactions and power supply follow the approved arrangement. Loaded and unloaded speeds remain specific to each motion and configuration. |
| Reference 1 · Listed hook-rating expression (t): 2 × 50 + 100 | Two-trolley lifting rating (t): 150 · Section-turning rating (t): 100 · Reference crane duty: A5 · Span (m): 50 · H1 lifting-height entry (m): 35 · H2 lifting-height entry (m): 35 · Hoisting, full load (m/min): 0.5–5 · Hoisting, no load (m/min): 1–10 · Gantry travel, full load (m/min): 2.5–25 · Gantry travel, no load (m/min): 3.5–35 · Trolley travel, full load (m/min): 2.5–25 · Trolley travel, no load (m/min): 2.5–35 · Wheel-load reference (kN): 260 · Total power (kW): 400 · Reference power supply: Three-phase AC, 50 Hz, 10 kV |
| Reference 2 · Listed hook-rating expression (t): 2 × 75 + 100 | Two-trolley lifting rating (t): 200 · Section-turning rating (t): 150 · Reference crane duty: A5 · Span (m): 70 · H1 lifting-height entry (m): 50 · H2 lifting-height entry (m): 50 · Hoisting, full load (m/min): 0.5–5 · Hoisting, no load (m/min): 1–10 · Gantry travel, full load (m/min): 2–20 · Gantry travel, no load (m/min): 3–30 · Trolley travel, full load (m/min): 2.5–25 · Trolley travel, no load (m/min): 2.5–35 · Wheel-load reference (kN): 320 · Total power (kW): 530 · Reference power supply: Three-phase AC, 50 Hz, 10 kV |
| Reference 3 · Listed hook-rating expression (t): 2 × 100 + 160 | Two-trolley lifting rating (t): 300 · Section-turning rating (t): 200 · Reference crane duty: A5 · Span (m): 38.5 · H1 lifting-height entry (m): 28 · H2 lifting-height entry (m): 28 · Hoisting, full load (m/min): 0.4–4 · Hoisting, no load (m/min): 0.8–8 · Gantry travel, full load (m/min): 3–30 · Gantry travel, no load (m/min): 4.5–45 · Trolley travel, full load (m/min): 3–30 · Trolley travel, no load (m/min): 3–45 · Wheel-load reference (kN): 330 · Total power (kW): 650 · Reference power supply: Three-phase AC, 50 Hz, 10 kV |
| Reference 4 · Listed hook-rating expression (t): 2 × 150 + 200 | Two-trolley lifting rating (t): 500 · Section-turning rating (t): 300 · Reference crane duty: A5 · Span (m): 175 · H1 lifting-height entry (m): 65 / 10 · H2 lifting-height entry (m): 65 / 10 · Hoisting, full load (m/min): 0.5–5 · Hoisting, no load (m/min): 1–10 · Gantry travel, full load (m/min): 1–25 · Gantry travel, no load (m/min): 1–30 · Trolley travel, full load (m/min): 1–25 · Trolley travel, no load (m/min): 1–30 · Wheel-load reference (kN): 700 · Total power (kW): 1550 · Reference power supply: Three-phase AC, 50 Hz, 10 kV |
| Reference 5 · Listed hook-rating expression (t): 2 × 400 + 400 | Two-trolley lifting rating (t): 1000 · Section-turning rating (t): 800 · Reference crane duty: A5 · Span (m): 185 · H1 lifting-height entry (m): 76 / 13 · H2 lifting-height entry (m): 76 / 13 · Hoisting, full load (m/min): 0.32–3.2 · Hoisting, no load (m/min): 0.64–6.4 · Gantry travel, full load (m/min): 3–30 · Gantry travel, no load (m/min): 3–40 · Trolley travel, full load (m/min): 3–30 · Trolley travel, no load (m/min): 3–40 · Wheel-load reference (kN): 750 · Total power (kW): 1500 · Reference power supply: Three-phase AC, 50 Hz, 10 kV |