Skip to content
Henan mine crane co., ltd. Get a project quote
Henan Mine Crane · Shipyard block handling

Shipbuilding Gantry Cranes

Shipbuilding gantry cranes, also called Goliath cranes, lift, turn and position hull blocks across dry docks, slipways and assembly yards. Compare MU layouts, specifications and equipment budgets for your shipyard.

MU shipbuilding gantry crane with two hoist trolleys and lifting hooks

MU shipbuilding gantry cranes

Wide-span block handling for ship construction and offshore-section assembly. Match the hook arrangement to the block weight, lifting points and required turning sequence.

MU shipbuilding gantry crane with two hoist trolleys and lifting hooks
MU

MU Shipbuilding Gantry Crane

Lift, turn and position ship blocks across dock and slipway assembly areas.

ApplicationShip-section lifting and assembly
Support layoutRigid and flexible legs
ControlsPLC and variable-frequency control
All specifications
Model MU
Crane arrangement Shipbuilding gantry on dock or slipway rails
Lifting attachment Hook and ship-section lifting tools
Rated suspended load Selected for the load, complete attachment and rigging
Span Selected from the runway centres and required working coverage
Lifting height Upper and lower pickup levels specified with attachment depth and headroom
Working class Selected for the load spectrum, lifts per hour and shifts
Hoisting performance Lifting and positioning speeds specified with the selected mechanism
Trolley travel Travel speed, stopping control and hook approaches selected for the task
Crane travel Speed, runway length and stopping positions specified for the working route
Operating controls Operator position and controls selected for visibility and the process
Electrical supply Site voltage, phases, frequency and power-feed arrangement specified in the offer
Rail and civil interface Rail section, wheel reactions and supporting foundations selected together
Outdoor design Site wind exposure, parking restraint and environmental protection specified where applicable
Clearance envelope Load passage, access and maintenance clearances shown in the arrangement drawing
Supply scope Crane equipment, rail work, installation and commissioning responsibilities agreed in the quotation
Girder layout Single- or double-main-girder arrangement selected for the project
Control package PLC and variable-frequency communication control
Safety monitoring Data and video monitoring functions defined in the equipment scope
Multiple lifting points Individual hook ratings, permitted combined loads and turning sequence specified in the lift plan
Supporting legs Rigid and flexible leg arrangement matched to the selected gantry structure
Structural design Principal load-bearing members analyzed for the ordered load cases and geometry
Motion buffering Buffers and the hoisting/braking arrangement selected to control motion shocks
Separate shipbuilding references Five reference configurations below; the offer confirms the ordered MU ratings and geometry.
Shipbuilding reference configurations — lifting and turning ratings Reference schedules for initial comparison, not fixed MU packages. Hook ratings, combined lifts and turning ratings are separate. H1/H2 dimensions, usable hook travel, wheel reactions and power supply follow the approved arrangement. Loaded and unloaded speeds remain specific to each motion and configuration.
Reference 1 · Listed hook-rating expression (t): 2 × 50 + 100 Two-trolley lifting rating (t): 150 · Section-turning rating (t): 100 · Reference crane duty: A5 · Span (m): 50 · H1 lifting-height entry (m): 35 · H2 lifting-height entry (m): 35 · Hoisting, full load (m/min): 0.5–5 · Hoisting, no load (m/min): 1–10 · Gantry travel, full load (m/min): 2.5–25 · Gantry travel, no load (m/min): 3.5–35 · Trolley travel, full load (m/min): 2.5–25 · Trolley travel, no load (m/min): 2.5–35 · Wheel-load reference (kN): 260 · Total power (kW): 400 · Reference power supply: Three-phase AC, 50 Hz, 10 kV
Reference 2 · Listed hook-rating expression (t): 2 × 75 + 100 Two-trolley lifting rating (t): 200 · Section-turning rating (t): 150 · Reference crane duty: A5 · Span (m): 70 · H1 lifting-height entry (m): 50 · H2 lifting-height entry (m): 50 · Hoisting, full load (m/min): 0.5–5 · Hoisting, no load (m/min): 1–10 · Gantry travel, full load (m/min): 2–20 · Gantry travel, no load (m/min): 3–30 · Trolley travel, full load (m/min): 2.5–25 · Trolley travel, no load (m/min): 2.5–35 · Wheel-load reference (kN): 320 · Total power (kW): 530 · Reference power supply: Three-phase AC, 50 Hz, 10 kV
Reference 3 · Listed hook-rating expression (t): 2 × 100 + 160 Two-trolley lifting rating (t): 300 · Section-turning rating (t): 200 · Reference crane duty: A5 · Span (m): 38.5 · H1 lifting-height entry (m): 28 · H2 lifting-height entry (m): 28 · Hoisting, full load (m/min): 0.4–4 · Hoisting, no load (m/min): 0.8–8 · Gantry travel, full load (m/min): 3–30 · Gantry travel, no load (m/min): 4.5–45 · Trolley travel, full load (m/min): 3–30 · Trolley travel, no load (m/min): 3–45 · Wheel-load reference (kN): 330 · Total power (kW): 650 · Reference power supply: Three-phase AC, 50 Hz, 10 kV
Reference 4 · Listed hook-rating expression (t): 2 × 150 + 200 Two-trolley lifting rating (t): 500 · Section-turning rating (t): 300 · Reference crane duty: A5 · Span (m): 175 · H1 lifting-height entry (m): 65 / 10 · H2 lifting-height entry (m): 65 / 10 · Hoisting, full load (m/min): 0.5–5 · Hoisting, no load (m/min): 1–10 · Gantry travel, full load (m/min): 1–25 · Gantry travel, no load (m/min): 1–30 · Trolley travel, full load (m/min): 1–25 · Trolley travel, no load (m/min): 1–30 · Wheel-load reference (kN): 700 · Total power (kW): 1550 · Reference power supply: Three-phase AC, 50 Hz, 10 kV
Reference 5 · Listed hook-rating expression (t): 2 × 400 + 400 Two-trolley lifting rating (t): 1000 · Section-turning rating (t): 800 · Reference crane duty: A5 · Span (m): 185 · H1 lifting-height entry (m): 76 / 13 · H2 lifting-height entry (m): 76 / 13 · Hoisting, full load (m/min): 0.32–3.2 · Hoisting, no load (m/min): 0.64–6.4 · Gantry travel, full load (m/min): 3–30 · Gantry travel, no load (m/min): 3–40 · Trolley travel, full load (m/min): 3–30 · Trolley travel, no load (m/min): 3–40 · Wheel-load reference (kN): 750 · Total power (kW): 1500 · Reference power supply: Three-phase AC, 50 Hz, 10 kV

Capacity, span, lifting height and hook arrangement are selected together. A combined lifting rating does not automatically apply during block turning; the technical offer defines each permitted operating mode.

Budget planning

Shipbuilding gantry crane prices

Indicative equipment-supply budgets for three shipyard configurations. Span, hook height, lifting duty and the trolley/control package affect the final price.

Preliminary equipment budgets — USD per crane package
Illustrative configuration Equipment budget (USD)
300 t concept · 50 m span · 30 m assumed lift USD 1,900,000–3,600,000 · One crane, factory equipment supply; geometry is an estimating scenario.
450 t concept · 100 m span · 50 m assumed lift USD 4,000,000–8,000,000 · One crane, factory equipment supply; geometry is an estimating scenario.
1,000 t concept · 185 m span · 80 m assumed lift USD 12,000,000–23,000,000 · One crane, factory equipment supply; geometry is an estimating scenario.
Included in these concept budgets Fabricated/painted crane structure, upper/lower trolley equipment, on-crane travel and controls, ordinary crane-mounted protections, engineering, factory checks and modular packing.
Priced separately Foundations, runway rails/beams, yard power, freight/insurance, duties/taxes, site erection, temporary lifting equipment, proof-load commissioning, local approvals, lifting beams/slings and automatic turnover or tandem features.

Preliminary planning estimates for the stated assumptions, not firm quotations or turnkey totals. The final offer confirms the structure, load chart, controls and delivery scope. Automatic turning and tandem-lift functions are priced to the agreed operating plan.

Send the heaviest block weight, span, required hook height, lifting points and dock layout for a project-specific equipment and installation quotation.

Get a quote for your configuration
Project reference

450 t shipbuilding gantry for section assembly

Henan Mine Crane’s 450 t large-span shipbuilding gantry entered service in June 2025 for lifting, turning and joining large ship and offshore-engineering sections.

The installation combines a rigid and flexible leg arrangement, coordinated hooks and travel skew correction. PLC and variable-frequency controls support the section-handling sequence.

View the 450 t shipbuilding project
450 t Henan mine crane co., ltd. shipbuilding gantry crane over a ship under construction
450 t Henan mine crane co., ltd. shipbuilding gantry crane over a vessel under construction.

Shipbuilding gantry crane buying questions

When is a shipbuilding gantry crane the right choice?

Choose a shipbuilding gantry for large hull blocks or offshore sections that need lifting, turning and positioning over a dock or assembly area. A container gantry handles containerized loads; a marine travel lift supports and moves complete vessels. Neither is a direct substitute for a multi-hook block-handling crane.

Can the crane turn a block at its full rated capacity?

Not automatically. Each hook rating, hook spacing, centre of gravity and load-sharing arrangement must suit the turning sequence. Specify the block and rigging weight together. The approved lifting arrangement states the allowable load for lifting, turning and any simultaneous hook operation.

What should I send for a shipyard crane quotation?

Start with the heaviest block and its dimensions, lifting-point drawing, dock or rail layout, and required lifting height. Include the project location and planned handling frequency. If a turning sequence is not yet defined, send the available block drawings so the hook arrangement can be reviewed.

Compare the range

Shipbuilding gantry crane specification comparison

Compare five shipbuilding reference configurations. Each row keeps its two-trolley lifting rating, turning rating and span together; these references are not five separate MU models.

Swipe across the table to compare specifications.

Model / product Arrangement Capacity Span / working width Lifting height Working class
Shipbuilding Gantry Crane · 2 × 50 + 100 t reference Double-girder shipbuilding reference Two-trolley 150 t; turning 100 t 50 m Drawing-specific Reference A5
Shipbuilding Gantry Crane · 2 × 75 + 100 t reference Double-girder shipbuilding reference Two-trolley 200 t; turning 150 t 70 m Drawing-specific Reference A5
Shipbuilding Gantry Crane · 2 × 100 + 160 t reference Double-girder shipbuilding reference Two-trolley 300 t; turning 200 t 38.5 m Drawing-specific Reference A5
Shipbuilding Gantry Crane · 2 × 150 + 200 t reference Double-girder shipbuilding reference Two-trolley 500 t; turning 300 t 175 m Drawing-specific Reference A5
Shipbuilding Gantry Crane · 2 × 400 + 400 t reference Double-girder shipbuilding reference Two-trolley 1000 t; turning 800 t 185 m Drawing-specific Reference A5

H1/H2 reference dimensions remain in All specifications; useful hook travel is confirmed on the arrangement drawing. Individual hooks, combined lifts and turning operations have separate approved ratings. The final MU package is configured for your dock.

Specify the crane around your ship blocks.

Send the block weight and dimensions, lifting points, dock layout and project location. Request an itemized offer covering the crane, selected hook arrangement and control package.

Equipment, foundations, transport, erection and acceptance testing are listed with clear supply boundaries.

Request a quotation