Dry-dock assembly
Place blocks over the vessel through the planned lifting and lowering sequence. Include dock depth, hull clearance, block height, rigging and useful hook approach in the layout.
Bridge cranes for workshops and production lines.
Explore Overhead Cranes
Ground-supported lifting for yards and construction.
Explore Gantry Cranes
Wire rope and chain hoists for lifting points and cranes.
Explore Electric Hoists

Wire rope lifting and pulling with a powered drum.
Explore Electric Winches
Grab buckets, magnets and hooks for your load.
Explore Lifting Attachments & Grabs
Mobile handling for containers, precast and yard loads.
Explore Rubber-Tired Gantry Cranes & Straddle Carriers

Lift and move vessels through boatyards and marinas.
Explore Marine Travel Lifts
Ladle, slab, scrap and coil handling across steel production.

Container stacking and cargo transfers across terminals and rail.

Turbine installation, powerhouse maintenance and wind equipment assembly.

Controlled component transfer and positioning for precision assembly.

Heavy fabrication, production lifting and factory crane automation.

Process lifting for smelters, carbon blocks and anode materials.

Clean lifting and classified protection for sensitive process areas.

Bridge fabrication, metro construction and ship block assembly.

Automated storage and retrieval for plates, cables and bins.

Follow project dispatches, crane engineering and factory acceptance.

Dispatch, installation and equipment in service

Crane configurations and handling technology

Factory inspections, acceptance and test programmes

Company developments, people and community programmes
Handle ship blocks and heavy assemblies with a gantry selected around the dock, lifting points and placement sequence. Compare the required hook combination, load sharing, span and lifting height together. Main and auxiliary mechanisms, outdoor restraints and coastal protection belong in the selected shipyard configuration.

Match the hook arrangement and operating envelope to the ship block, its lifting points and the dock.
Place blocks over the vessel through the planned lifting and lowering sequence. Include dock depth, hull clearance, block height, rigging and useful hook approach in the layout.
Lift and turn large sections using the agreed lifting points and load-sharing method. Define the centre of gravity, required hook spacing and surrounding clearance before comparing arrangements.
Position machinery and modules within the selected crane coverage. Check auxiliary-hook reach, access to set-down positions and interference with the main trolley or other active lifting equipment.
Capacity, span, useful hook travel and mechanisms are confirmed together for the quoted unit.
| Parameter | Reference selection range | Procurement check |
|---|---|---|
| Product / arrangement | Shipbuilding Gantry Crane | Confirm the exact machine and lifting device in the offered drawing. |
| Published capacity family | 100–450 t | Select a rated hook combination for the actual block and rigging. |
| Published span family | 40–97 m | Confirm selected span, hook approaches and dock width. |
| Published lifting-height family | 35–70 m | Include ship-block height, rigging and dock depth. |
| Published working-class family | A7–A8 | Verify duty for the planned lift frequency. |
| Rated load for your order | Set from the complete suspended mass, including the ship block, rigging and lifting device. | Include the attachment and rigging in the complete suspended mass. |
| Span / operating envelope | Set from the approved site and load drawing | Show the whole route, not only the pickup point. |
| Lifting height / under-clearance | Set from pickup, travel and placement | Include load depth, spreader or beam and safe clearance. |
| Duty / handling cycle | Select from lifts, loaded distance and shifts | State typical and maximum loads plus moves per hour. |
| Lifting arrangement | Main and auxiliary / multiple hooks by design | Define individual ratings, combined lift and allowable spacing. |
| Outdoor protection | Wind parking and coastal protection by site | Ask for operating wind limit, restraints and corrosion specification. |
| Rail reactions / wind | Calculated for the final selected machine | Check governing loaded, travel, braking and parked cases. |
Define individual hook ratings, combined lifts, lifting-point spacing and the turning sequence. Include block mass, rigging, lifting beams and centre of gravity in each load case.
Mark dock width, depth, runway length, hook approaches and the complete turning envelope. Select span and useful lifting height together with rail-support reactions.
State loaded moves per hour, shifts, travel distances and placement accuracy. Agree the mechanism duties, controls and acceptance method for the selected lifting sequence.
Specify operating wind, storm parking, restraints and corrosion protection. Confirm bearing capacity, power, delivery access, shipping sections and the division of installation responsibilities.
Order one complete crane or define a project package. Itemise the gantry structure, main and auxiliary lifting mechanisms, travel drives and outdoor protection.
Request the selected load, dimensions and mechanisms, arrangement drawing, reactions, operating and electrical information, applicable inspection/test records and destination conformity documents.
Agree the production, factory inspection and dispatch dates after configuration approval. Confirm packing, transport dimensions, freight route and unloading access separately from site work.
Define site readiness, personnel and equipment for assembly, electrical hookup, commissioning and load testing. Agree operator information, training and the factory/site acceptance requirements.
Put warranty duration and component coverage in the offer. Separate wear parts and site-service costs; agree installation guidance, engineer attendance and model-matched maintenance parts.
State the approved equipment, support or floor interfaces and each party’s responsibilities. Include shipping terms, installation boundaries, handover documents and after-sales response in the contract.
Request service and warranty terms ↗Review related equipment against your load, site geometry and operating cycle.
Check the selection, commercial scope and installation requirements before ordering.
Only when the quoted crane includes the required combined rating, synchronization, interlocks, lifting beam and witnessed test.
Ask for a quotation for one complete machine. Confirm the commercial minimum and exactly which attachments and services are included.
List the destination-specific compliance documents, factory acceptance test and site load or travel tests in the purchase specification.
Request a dated factory dispatch commitment measured from deposit and approved drawings; show freight, erection and commissioning separately.
Share your load and dock width, runway length, block turning envelope and rail support, operating cycle, site conditions and destination. Ask for a matched GA drawing, reaction schedule, equipment list, tests and dated commercial offer.
Discuss your project