Remove cured components
Use the engineer-approved lifting points and concrete strength.
Bridge cranes for workshops and production lines.
Explore Overhead Cranes
Ground-supported lifting for yards and construction.
Explore Gantry Cranes
Wire rope and chain hoists for lifting points and cranes.
Explore Electric Hoists

Wire rope lifting and pulling with a powered drum.
Explore Electric Winches
Grab buckets, magnets and hooks for your load.
Explore Lifting Attachments & Grabs
Mobile handling for containers, precast and yard loads.
Explore Rubber-Tired Gantry Cranes & Straddle Carriers

Lift and move vessels through boatyards and marinas.
Explore Marine Travel Lifts
Ladle, slab, scrap and coil handling across steel production.

Container stacking and cargo transfers across terminals and rail.

Turbine installation, powerhouse maintenance and wind equipment assembly.

Controlled component transfer and positioning for precision assembly.

Heavy fabrication, production lifting and factory crane automation.

Process lifting for smelters, carbon blocks and anode materials.

Clean lifting and classified protection for sensitive process areas.

Bridge fabrication, metro construction and ship block assembly.

Automated storage and retrieval for plates, cables and bins.

Follow project dispatches, crane engineering and factory acceptance.

Dispatch, installation and equipment in service

Crane configurations and handling technology

Factory inspections, acceptance and test programmes

Company developments, people and community programmes
Carry bridge beams and precast segments from production to curing, storage and trailer loadout.
Get a configuration and price matched to your load, dimensions, operating cycle and delivery destination.

Choose a mobile carrier when large concrete elements must move among several yard stations.
Use the engineer-approved lifting points and concrete strength.
Check support locations and placement height.
Survey trailer position and load overhang.
The technical offer should state the rated load basis, complete lifting tool, operating envelope, duty and governing site reactions for your order.
Compare the specifications and selection requirements
| Parameter | Reference selection range | Procurement check |
|---|---|---|
| Product / arrangement | Precast Concrete Straddle Carrier | Confirm the exact machine and lifting device in the offered drawing. |
| Rated load for your order | Set from the complete suspended mass of the precast beam or segment, lifting beam and rigging. | Include the attachment and rigging in the complete suspended mass. |
| Clear width / operating envelope | Set from the approved site and load drawing | Show the whole route, not only the pickup point. |
| Lifting height / under-clearance | Set from pickup, travel and placement | Include load depth, spreader or beam and safe clearance. |
| Duty / handling cycle | Select from lifts, loaded distance and shifts | State typical and maximum loads plus moves per hour. |
| Complete suspended load | Component + beam + rigging | Use maximum shipping or handling mass. |
| Clear width | From largest component and route | Check end overhang and turning sweep. |
| Lifting-point spacing | Engineer-approved | Specify sling angles and load sharing. |
| Tire reactions / route | Calculated for the final selected machine | Check governing loaded, travel, braking and parked cases. |
What the final drawing must show: Rated load · clear width · lift and under-clearance · tire reactions · steering, brakes and controls
Send the heaviest load and its lifting points together with a dimensioned route. The quotation should state the selected machine, precast lifting beam and certified anchors, site reactions and acceptance method.
Provide the precast beam or segment, attachment mass, lifting points and centre of gravity.
Mark mold bay, curing area, storage and dispatch path on a drawing.
State loaded moves per hour, shifts, distances and required placement accuracy.
Provide bearing capacity, power, climate, access and destination requirements.
Ask each bidder to quote the same lifting arrangement, site interface, tests and dispatch milestone.
Request the GA, rated configuration, mold bay, curing area, storage and dispatch path and governing reactions.
List the precast lifting beam and certified anchors, drives, braking, control and protection as included or excluded.
Set lift-point approval, route and pavement review, loaded travel test, freight, site services and dispatch date in the contract.
Align the selected equipment, technical documents, factory dispatch and site responsibilities before placing your order.
Request a quotation for one crane or a complete project package; confirm the minimum order for the selected configuration.
Agree the documents for the quoted crane and destination: applicable conformity documents, inspection and test records, operating manuals and the approved technical schedule.
Agree drawing approval, fabrication, machinery and control integration, factory testing, transport and commissioning milestones for the selected handling system.
Specify the documents required for your equipment, destination and site approval in the technical offer.
Agree the load cases, dimensions, operating envelope and supply schedule.
Set the inspection scope, acceptance criteria and customer witness points.
Confirm transport dimensions, shipping route, packing list and unloading access.
Agree site readiness, commissioning, load testing and operator training.
Request a written warranty schedule identifying the steel structure, drives, controls, power system and lifting attachment, with destination service and wear-part terms.
Request service and warranty terms ↗Include commissioning support, operator training, fault diagnosis and a critical-spares list. Define response arrangements and any on-site technician scope before the order.
Identify the equipment and personnel needed for unloading, installation and commissioning. Put responsibilities and acceptance requirements in the agreed project schedule.
Review related equipment against your load, site geometry and operating cycle.
Check the selection, commercial scope and installation requirements before ordering.
Only after its designer approves lifting strength, anchor capacity and the actual pick-point arrangement.
Ask for a quotation for one complete machine. Confirm the commercial minimum and exactly which attachments and services are included.
List the destination-specific compliance documents, factory acceptance test and site load or travel tests in the purchase specification.
Request a dated factory dispatch commitment measured from deposit and approved drawings; show freight, erection and commissioning separately.
Share your load and mold bay, curing area, storage and dispatch path, operating cycle, site conditions and destination. Ask for a matched GA drawing, reaction schedule, equipment list, tests and dated commercial offer.
Discuss your project