Container and other cargo dimensions
Taicang Port Container Yard Crane
A busy port yard needs repeatable container stacking while leaving room for different cargo-handling attachments.

Start with the load and the process route.
A busy port yard needs repeatable container stacking while leaving room for different cargo-handling attachments.
The load, lifting attachment, traffic interface and control sequence need to be reviewed as one operating system.
Prepare the technical brief ↗Rail and traffic layout
Attachment changeover requirements
Peak lifts and maintenance window
Keep container and mixed-cargo moves aligned with port traffic.
Use rail-mounted gantries with controlled travel, anti-sway, truck protection and guided spreader positioning. Plan the trolley and exchangeable lifting gear for the actual cargo mix rather than assuming every move uses one spreader.

Plan yard lanes
Set rail span, cantilever and truck clearances from the port layout.
Lift and stack
Guide the container between the lane and assigned block with sway control.
Change cargo mode
Define a safe method for swapping lifting gear when non-container loads are scheduled.
Attachment interchange
Check capacity and clearance in every lifting-gear configuration.
Port availability
Plan inspection access and operating schedules for continuous yard use.
Taicang Port gantry delivery
Henan Mine Crane delivered two rail-mounted container gantries to Taicang Port, with PLC and variable-frequency control, remote monitoring, anti-sway, truck anti-lift protection and interchangeable lifting gear.




Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Container and other cargo dimensions | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Rail and traffic layout | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Attachment changeover requirements | Attachment dimensions/masses, changeover procedure and connection/interlock interfaces. |
| 04 / Site requirement | Peak lifts and maintenance window | Handling rate, duty classification, service access and planned maintenance availability. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane be customized for our site?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗
























