Skip to content
Henan mine crane co., ltd. Get a project quote
POWER PLANT CRANE SOLUTIONS

500 t Offshore Wind Component Assembly

A large offshore wind facility needs high-capacity handling that maintains the component's attitude while moving between production stations.

ApplicationOffshore wind energy project
Project equipmentBuilt for this handling task
Site-specificLoad, route, duty and delivery scope
Heavy overhead crane installed for offshore wind component assembly
Heavy overhead crane installed for offshore wind component assembly.
THE OPERATING CHALLENGE

Start with the component and the lift route.

A large offshore wind facility needs high-capacity handling that maintains the component's attitude while moving between production stations.

The lifted component, rigging, building clearances and control sequence need to be reviewed as one operating system.

Prepare the technical brief ↗
01 / DEFINE

Heaviest assembly and rigging

02 / DEFINE

Lift height and trolley spacing

03 / DEFINE

Assembly route and fixture locations

04 / DEFINE

Monitoring and availability target

ENGINEERED FOR THE APPLICATION

Move extra-heavy wind components through a repeatable factory route.

Use a 500 t double-trolley bridge-crane plan for the heaviest assemblies and coordinate it with the rest of the plant fleet. Synchronize hooks, select fast and slow travel ranges, and use anti-sway and visual monitoring for station hand-offs.

Heavy overhead crane installed for offshore wind component assembly
Heavy overhead crane installed for offshore wind component assembly.
01

Prepare the rigging

Confirm component mass, lift points and center of gravity.

02

Travel between stations

Coordinate the two trolleys and monitor load balance.

03

Seat at the fixture

Slow the movement for precise placement and inspect the next lift path.

✓

Fleet coverage

Make sure the 500 t unit and smaller cranes serve complementary work areas.

✓

Safety monitoring

Specify protection and recording for heavy lifts and frequent operation.

PROJECT IN OPERATION

Offshore wind energy project

The project used a 500 t double-trolley bridge crane installed and operating at an offshore wind project; the first project phase included 43 lifting systems.

Process fit500 t Offshore Wind Component Assembly Solution
EquipmentQE Double-Trolley Hook Overhead Crane / KSQE New-Design Double-Trolley Crane
ProjectOffshore wind energy project
Technical reviewCustomer load and site drawings
SPECIFICATION FOR YOUR SITE

Define the operating brief before fixing a crane model.

Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.

InputInformation needed for this applicationConfirm in the technical offer
01 / Site requirementHeaviest assembly and riggingRated load including the attachment, lifting-point arrangement and load cases.
02 / Site requirementLift height and trolley spacingCrane span, lifting height, headroom, wheel loads and runway or foundation interfaces.
03 / Site requirementAssembly route and fixture locationsDuty classification, speeds and control behaviour matched to the agreed operating cycle.
04 / Site requirementMonitoring and availability targetProtection, positioning, interlocks, monitoring and safe recovery requirements.
Destination and deliveryCountry, project standards, quantity, freight and site services.Documents, inspection and testing, packing, installation support and agreed delivery milestones.
Have a preliminary layout?

Send the available load schedule and drawings. The missing inputs can be identified during technical review.

Discuss your project ↗
FROM OFFER TO HANDOVER

Compare the complete lifting package.

The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.

01

Engineering

General arrangement, load basis, runway and utility interfaces, control and protection schedule.

02

Manufacture & inspection

Approved drawings, inspection plan and factory testing for the selected configuration.

03

Shipping & site work

Packing, freight, erection support, commissioning and operator training as specified.

04

Handover

Test records, manuals, maintenance instructions and agreed spare-parts list.

Order quantity, compliance and delivery schedule

Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.

BUYER QUESTIONS

Before you request a quotation.

What information is needed to specify this crane solution?

Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.

Can the crane be configured for our powerhouse or factory?

Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.

What are the order quantity, certification and lead time?

We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.

LET'S REVIEW YOUR PROJECT

Send your project brief. Get a crane proposal built around your process.

Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.

Send your project requirements ↗