Prepare the rigging
Confirm component mass, lift points and center of gravity.
A large offshore wind facility needs high-capacity handling that maintains the component's attitude while moving between production stations.
Henan Mine Crane equipment for Offshore wind energy project
A large offshore wind facility needs high-capacity handling that maintains the component's attitude while moving between production stations.
Use a 500 t double-trolley bridge-crane plan for the heaviest assemblies and coordinate it with the rest of the plant fleet. Synchronize hooks, select fast and slow travel ranges, and use anti-sway and visual monitoring for station hand-offs.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Confirm component mass, lift points and center of gravity.
Coordinate the two trolleys and monitor load balance.
Slow the movement for precise placement and inspect the next lift path.
These choices affect safety, process fit and the operating life of the installation.
Make sure the 500 t unit and smaller cranes serve complementary work areas.
Specify protection and recording for heavy lifts and frequent operation.
See how cranes and lifting systems were configured for demanding operating environments.

The project used a 500 t double-trolley bridge crane installed and operating at an offshore wind project; the first project phase included 43 lifting systems.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗