Component lengths and lifted masses
Offshore Wind Assembly Multi-Hook Lifting
Large offshore wind components can require several pickup points, high lift and slow final positioning during assembly.

Start with the component and the lift route.
Large offshore wind components can require several pickup points, high lift and slow final positioning during assembly.
The lifted component, rigging, building clearances and control sequence need to be reviewed as one operating system.
Prepare the technical brief ↗Assembly bay clearance and lift height
Hook synchronization tolerance
Shift schedule and monitoring scope
Lift long wind-turbine assemblies without losing alignment.
Specify the workshop crane fleet around component geometry and sequence. Synchronize multiple hooks, apply controlled speed and anti-sway, and monitor the lift path visually and digitally before each assembly hand-off.

Rig the component
Set lifting points and center of gravity for the current assembly stage.
Move at matched speed
Keep hooks synchronized during high lift and cross-travel.
Align and release
Use low-speed positioning at the fixture and confirm a stable support before unhooking.
Multi-point load sharing
Check hook load balance throughout travel and rotation of the component.
Assembly availability
Plan monitoring and service access around the production schedule.
Offshore wind assembly base
Dozens of cranes supported an offshore wind-turbine assembly base, with high lift, synchronized hooks, electrical anti-sway and digital and visual monitoring.


Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Component lengths and lifted masses | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Assembly bay clearance and lift height | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Hook synchronization tolerance | Duty classification, speeds and control behaviour matched to the agreed operating cycle. |
| 04 / Site requirement | Shift schedule and monitoring scope | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane be configured for our powerhouse or factory?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗
























