Skip to content
CRANE MANUFACTURER SINCE 2002
info@cranehenanmine.com+86 188 3620 7779Project enquiry ↗
Get a project quote
Home/Case studies/Aluminum & Carbon Materials/Carbon Block Stacking Crane for a Shandong Baking-Furnace Plant
PROJECT CASE / ALUMINUM & CARBON MATERIALS

Carbon Block Stacking Crane for a Shandong Baking-Furnace Plant

A double-girder stacking crane uses two guided attachments, variable-frequency drives and a protected electrical room for a dusty, hot process area.

Carbon block stacking crane above a carbon baking production line
Carbon block stacking crane above a carbon baking production line.
INDUSTRYAluminum & Carbon Materials
LOCATIONShandong, China
StructureBox-type double girders, one trolley and two attachments
PROJECT STAGEIn operation
01 / PROJECT CONTEXT

The project and its handling task.

Henan Mine Crane developed a carbon-block stacking crane for a new carbon-material baking-furnace project in Shandong. The equipment entered use in a process that requires controlled gripping and repeatable block placement.

A box-type double-girder structure carries one trolley and two attachments. Rigid guide columns and multiple guide-wheel groups stabilize attachment movement. The two lifting tools can operate separately or in synchronized mode, with a pressure-holding arrangement supporting reliable gripping.

02 / HANDLING REQUIREMENTS

Grip and stack carbon blocks accurately in a hot, dusty plant.

A carbon-material baking facility needs secure repeated handling of blocks while keeping drives and controls serviceable despite dust and heat.

Block size, mass and stack height

Record block size, group size and available aisle widths.

Bay aisle and crane span

Use guided tools to keep blocks stable through the vertical move.

Temperature and dust profile

Coordinate independent or linked attachments with the next stack position.

Independent/linked tool sequence

Coordinate independent or linked attachments with the next stack position.

Carbon block stacking crane above a carbon baking production line
Carbon block stacking crane above a carbon baking production line.
03 / SUPPLIED SYSTEM

The equipment behind this project.

A box-type double-girder structure carries one trolley and two attachments. Rigid guide columns and multiple guide-wheel groups stabilize attachment movement. The two lifting tools can operate separately or in synchronized mode, with a pressure-holding arrangement supporting reliable gripping.

  • StructureBox-type double girders, one trolley and two attachments
  • Attachment guidanceRigid guide columns and multiple guide-wheel groups
  • Operating arrangementIndependent or synchronized attachments
  • DrivesVariable-frequency integrated travel and hoisting
  • Electrical protectionCentral electrical room with industrial recirculating air conditioning
  • Safety devicesLimits, emergency electrical controls and monitoring
Explore the application solution ↗
04 / ENGINEERING DECISIONS

What to compare with your own project.

Match the project configuration to your load, layout and operating sequence before selecting a crane package.

Design areaThis project configurationDefine for your site
StructureBox-type double girders, one trolley and two attachmentsBlock size, mass and stack height. Define the required operating envelope and acceptance checks in your technical brief.
Attachment guidanceRigid guide columns and multiple guide-wheel groupsBay aisle and crane span. Define the required operating envelope and acceptance checks in your technical brief.
Operating arrangementIndependent or synchronized attachmentsTemperature and dust profile. Define the required operating envelope and acceptance checks in your technical brief.
DrivesVariable-frequency integrated travel and hoistingIndependent/linked tool sequence. Define the required operating envelope and acceptance checks in your technical brief.
Electrical protectionCentral electrical room with industrial recirculating air conditioningBlock size, mass and stack height. Define the required operating envelope and acceptance checks in your technical brief.
Safety devicesLimits, emergency electrical controls and monitoringBay aisle and crane span. Define the required operating envelope and acceptance checks in your technical brief.
05 / PROJECT PHOTOGRAPHS

See the equipment and working environment.

Explore the equipment arrangement and handling environment.

06 / PROJECT OUTCOME

In operation.

The crane was put into use at the carbon-material plant. Guided attachments and protected electrical equipment address repeatable stacking in a high-temperature, dusty operating environment.

For a similar project, specify a double-girder, single-trolley crane with two guided lifting tools where the block layout needs independent or linked operation. Variable-frequency drives, protected electrics and accessible monitoring support steady stacking cycles.

07 / PLAN A SIMILAR PROJECT

Prepare a comparable crane quotation.

Share the load schedule and site drawings. Specify a double-girder, single-trolley crane with two guided lifting tools where the block layout needs independent or linked operation. Variable-frequency drives, protected electrics and accessible monitoring support steady stacking cycles.

We can quote a single crane or a coordinated fleet. The offer sets out the destination standards, required certificates and inspection records, manufacturing programme after drawing approval, shipment, installation support and agreed acceptance scope.

  1. Block size, mass and stack height
  2. Bay aisle and crane span
  3. Temperature and dust profile
  4. Independent/linked tool sequence
  5. Destination standards, quantity and inspection documentation
  6. Manufacturing programme, shipment, commissioning, training and spares
BUYER QUESTIONS

Questions before specifying a similar crane.

Can the same project crane be supplied for my site?

We customize the capacity, span, lifting height, attachment and controls to the load, building or yard layout and operating cycle. Block size, mass and stack height is one of the inputs to review before final equipment selection.

How are certification, quantity and lead time agreed?

Single-crane and fleet enquiries are welcome. Define the destination and required standards in the enquiry. The project offer confirms certification and inspection documents, the quantity, drawing approval and manufacturing schedule, with the shipping and site-service boundaries.

What should acceptance and after-sales support include?

Agree the inspection plan, representative load and functional tests, operator training, maintenance instructions, spare-parts scope and fault-recovery procedures. For this application, include independent/linked tool sequence in the technical review.

ALUMINUM & CARBON MATERIALS PROJECT ENQUIRY

Planning a similar lifting project?

Send your layout, load and operating requirements. We can develop a customized crane package and delivery scope for your site.

Request a technical proposal ↗