Container mix and gross mass
Smart Dry Port Container Handling
A dry port must move containers across truck lanes and stacks without lifting a trailer or losing control of the spreader.

Start with the load and the process route.
A dry port must move containers across truck lanes and stacks without lifting a trailer or losing control of the spreader.
The load, lifting attachment, traffic interface and control sequence need to be reviewed as one operating system.
Prepare the technical brief ↗Truck lanes and rail gauge
Stack height and annual/peak moves
Remote-control and vehicle safeguards
Handle daily dry-port traffic with controlled container positioning.
Use a rail-mounted container gantry with variable-frequency travel, PLC control, anti-sway and truck anti-lift protection. Coordinate automatic container search and spreader guidance with the terminal's operating positions.

Receive the vehicle
Identify the container and confirm the truck has reached a safe transfer position.
Lift and travel
Monitor spreader engagement and sway as the container moves to its stack.
Set down accurately
Guide the spreader to the assigned slot and verify release.
Truck interface
Specify anti-lift safeguards and sight lines around each lane.
Monitoring and control
Agree remote operation, status signals and recovery from interrupted moves.
Wanli New Energy Smart Dry Port
Henan Mine Crane delivered a rail-mounted container gantry to the Wanli Dry Port project, whose planned annual throughput was 5 million tons; the crane used PLC control, remote monitoring and container guidance.



Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Container mix and gross mass | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Truck lanes and rail gauge | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Stack height and annual/peak moves | Duty classification, speeds and control behaviour matched to the agreed operating cycle. |
| 04 / Site requirement | Remote-control and vehicle safeguards | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane be customized for our site?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗
























