Bring in major components
Check delivery opening, laydown area and lifted assembly mass.
A pumped-storage powerhouse needs to position heavy generating equipment within strict building height and hook-coverage limits.
Henan Mine Crane equipment for National pumped-storage station
A pumped-storage powerhouse needs to position heavy generating equipment within strict building height and hook-coverage limits.
Use a low-headroom bridge-crane arrangement with synchronized hooks, variable-frequency control, anti-sway and digital monitoring. Confirm the lifting envelope against construction drawings and retain access for future component removal.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Check delivery opening, laydown area and lifted assembly mass.
Coordinate both hooks and the lift path within the powerhouse envelope.
Verify the same crane can support later removal and overhaul.
These choices affect safety, process fit and the operating life of the installation.
Protect clearance at every critical station, not only the main assembly bay.
Define acceptable load balance and monitoring for dual-hook lifts.
See how cranes and lifting systems were configured for demanding operating environments.

The project used a 600 t low-headroom bridge crane for a pumped-storage project, with high-precision dual-hook synchronization, anti-sway and digital monitoring.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗