Section and rigging schedule
300 t Bridge Fabrication Overhead Crane
Bridge fabrication needs heavy lifts that remain smooth near weld fixtures, assembly jigs and adjacent teams.

Start with the load and the process route.
Bridge fabrication needs heavy lifts that remain smooth near weld fixtures, assembly jigs and adjacent teams.
The load, lifting attachment, building interface and operating sequence need to be reviewed together.
Prepare the technical brief ↗Workshop span and hook approach
Fit-up station coordinates
Drive and service requirements
Move steel-bridge assemblies efficiently within a production bay.
Plan a 300 t bridge crane around the bay span, large-section pickup points and fabrication sequence. Modular construction, full variable-frequency control and service access can support positioning and later upgrades.

Rig the fabricated section
Identify lift points and temporary stiffening or supports.
Cross the workshop
Use controlled bridge travel and clear working zones.
Place at fit-up
Slow the movement for alignment and verify support before detaching.
Bay geometry
Check hook approach and neighboring jigs throughout the load sweep.
Upgrade access
Reserve practical electrical and service interfaces for future changes.
Zhangjinggao bridge workshop equipment
The project used a 300 t new-design double-girder bridge crane for the Zhangjinggao bridge project, with modular design and full variable-frequency control.




Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Section and rigging schedule | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Workshop span and hook approach | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Fit-up station coordinates | Duty classification, speeds and control behaviour matched to the agreed operating cycle. |
| 04 / Site requirement | Drive and service requirements | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane system be configured for our site and process?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗
























