Skip to content
Henan mine crane co., ltd. Get a project quote
CONSTRUCTION CRANE SOLUTIONS

72 m Bridge Span Gantry Lifting

A long bridge segment may need a crane to span roads, river-adjacent work and wide temporary assembly zones.

ApplicationJianzhou Bridge construction
Project equipmentBuilt for this handling task
Site-specificLoad, route, duty and delivery scope
Long-span gantry crane beside an urban bridge construction site
Long-span gantry crane beside an urban bridge construction site.
THE OPERATING CHALLENGE

Start with the load and the process route.

A long bridge segment may need a crane to span roads, river-adjacent work and wide temporary assembly zones.

The load, lifting attachment, building interface and operating sequence need to be reviewed together.

Prepare the technical brief ↗
01 / DEFINE

Box-girder segment mass

02 / DEFINE

Full span and runway drawing

03 / DEFINE

Wind and site-access plan

04 / DEFINE

Assembly support and alignment method

ENGINEERED FOR THE APPLICATION

Cover a long steel-box-girder work area with stable crane travel.

Set the 72 m crane span from the box-girder fabrication route and site obstructions. Check runway alignment, wind exposure, rigging and placement sequence before any heavy segment is moved.

Long-span gantry crane beside an urban bridge construction site
Long-span gantry crane beside an urban bridge construction site.
01

Stage the girder

Plan load pickup and temporary support for the changing box-girder section.

02

Cross the work zone

Verify clearance over roadway and site obstacles.

03

Land the lift

Align the steel segment with the next assembly support.

✓

Long-span stiffness

Check deflection and wheel loads under the heaviest segment.

✓

Outdoor conditions

Define weather limits and protected personnel routes.

PROJECT IN OPERATION

Jianzhou Bridge construction

A 72 m-span crane supported construction of the 580.5 m Jianzhou Bridge, which uses a variable-section continuous welded steel-box girder.

Process fit72 m Bridge Span Gantry Lifting Solution
EquipmentConstruction Gantry Crane
ProjectJianzhou Bridge construction
Technical reviewCustomer load and site drawings
SPECIFICATION FOR YOUR SITE

Define the operating brief before fixing a crane model.

Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.

InputInformation needed for this applicationConfirm in the technical offer
01 / Site requirementBox-girder segment massRated load including the attachment, lifting-point arrangement and load cases.
02 / Site requirementFull span and runway drawingCrane span, lifting height, headroom, wheel loads and runway or foundation interfaces.
03 / Site requirementWind and site-access planOperating/parked wind limits, restraint arrangements, erection access and site logistics.
04 / Site requirementAssembly support and alignment methodAssembly supports, alignment tolerances, survey method and installation responsibilities.
Destination and deliveryCountry, project standards, quantity, freight and site services.Documents, inspection and testing, packing, installation support and agreed delivery milestones.
Have a preliminary layout?

Send the available load schedule and drawings. The missing inputs can be identified during technical review.

Discuss your project ↗
FROM OFFER TO HANDOVER

Compare the complete lifting package.

The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.

01

Engineering

General arrangement, load basis, runway and utility interfaces, control and protection schedule.

02

Manufacture & inspection

Approved drawings, inspection plan and factory testing for the selected configuration.

03

Shipping & site work

Packing, freight, erection support, commissioning and operator training as specified.

04

Handover

Test records, manuals, maintenance instructions and agreed spare-parts list.

Order quantity, compliance and delivery schedule

Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.

RELATED CRANES AND SOLUTIONS

Compare equipment for this operating task.

These product families and related applications provide a starting point. Final selection follows the load and site review.

BUYER QUESTIONS

Before you request a quotation.

What information is needed to specify this crane solution?

Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.

Can the crane system be configured for our site and process?

Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.

What are the order quantity, certification and lead time?

We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.

LET'S REVIEW YOUR PROJECT

Send your project brief. Get a crane proposal built around your process.

Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.

Send your project requirements ↗