Skip to content
Henan mine crane co., ltd. Get a project quote
MGG / Single-trolley construction lifting

MGG engineering truss gantry crane

MGG serves bridge, highway and construction handling with twin truss girders, tubular steel legs and one winch trolley. Compare it for precast beams, material transfer and specified piling-spoil tasks. Match the complete suspended load and working sequence to hook coverage, rail positions and erection access.

Bridge
Twin truss main girders
Lifting
Single trolley and single winch
Legs
Tubular steel supports
Truss double-girder gantry cranes working above a precast construction area
Truss gantry access over a precast construction work area.Equipment application photograph
01 / APPLICATIONS

Where the MGG
fits the work.

01

Precast-beam handling

Move precast elements between preparation, storage and transfer positions. A lifting beam or other engineered attachment can connect the single hook to the element's lifting points.

02

Bridge and highway materials

Supply components and construction materials along a defined runway. The useful working area depends on hook approaches, leg openings and the receiving position of vehicles or assembly supports.

03

Specified piling-spoil duties

A construction process may require an appropriate spoil container or lifting attachment. The container interface, discharge method and operating cycle need to be selected with the hoisting package.

02 / TECHNICAL SPECIFICATIONS

MGG specifications
and equipment configuration.

Compare the lifting mechanism, control functions and site interfaces for the selected crane.

MGG technical specifications and configuration
ModelMGGMain-girder structureTwin truss main girders
Leg structureTubular steel legsTrolley arrangementSingle trolley
Hoisting mechanismSingle winchApplication focusBridge and highway construction work
Handling tasksPrecast-beam lifting, material transfer and specified piling-spoil operationsRated lifting capacitySelected for the complete suspended load, including lifting attachments and rigging
SpanRail-centre span selected for the construction work areaLifting heightWorking hook travel selected for the construction lifting sequence
Working classSelected for the load spectrum, lifts per hour and shiftsLifting attachmentHook, lifting beam or other attachment specified for the actual load
Hoisting speedLoaded lifting and positioning speeds selected with the winch packageTrolley travelCross-travel speed and usable hook approaches specified for the load route
Crane travelLong-travel speed and stopping control selected for the runwaySite clearancesLeg opening, load envelope and vehicle access shown in the arrangement
Transport and assemblyTransport sections, site assembly and installation access agreedOperator controlsOperator position and control package selected for visibility
Electrical supplyVoltage, phases, frequency and power-feed route specifiedRunway and exposureWheel reactions, rail interfaces and relevant wind provisions coordinated with the site

Capacity, span, lifting height and duty are selected together. The agreed equipment schedule and drawing define your crane configuration.

03 / EQUIPMENT VIEWS

See the MGG arrangement.

Review the original equipment views alongside the selected crane drawing.

MGG complete gantry arrangement, view 1
MGG gantry arrangement — manufacturer rendering, view 1.
MGG complete gantry arrangement, view 2
MGG gantry arrangement — manufacturer rendering, view 2.
MGG complete gantry arrangement, view 3
MGG gantry arrangement — manufacturer rendering, view 3.
04 / CONFIGURATION

Choose the MGG equipment and site interfaces.

01 / OPTION

Single-trolley lifting task

MGG has one trolley and one winch on twin truss girders with tubular steel legs. Select hook, lifting beam or container connection for the construction component; include attachment and rigging mass without assuming a second independent lifting point.

02 / OPTION

Coverage and operating cycle

Mark rail centres, leg passage, useful trolley approaches, pickup and placement positions. Describe precast-beam, material-transfer or specified piling-spoil duties, lifts per shift, travel distances and final placement so speeds and duty suit one actual process.

03 / OPTION

Controls, rail and power

Choose the operator position for visibility around stored beams and equipment. Define rail supply, alignment, foundations, wheel loads and horizontal reactions. State voltage, phases, frequency and power-feed routing clear of vehicle and material movement.

04 / OPTION

Transport and construction site

Agree delivery sections, erection space, assembly sequence and site lifting access. Include any relocation requirement in the scope. Describe outdoor exposure, power availability and access for maintenance alongside the prepared runway and civil works.

05 / PURCHASING & DELIVERY

Confirm the complete MGG supply scope.

ORDER

Order quantity

Enquire for one complete MGG crane or the quantity required for your construction programme. Share the load, estimated span, useful hook height and destination; a preliminary site sketch is helpful.

QUOTATION

Equipment and quotation scope

The quotation should identify the single-trolley lifting package, attachments, controls, runway interfaces and excluded civil work. Price and manufacturing schedule follow the selected arrangement and delivery scope.

DOCUMENTS

Drawings and equipment documents

Request the general arrangement, lifting and electrical schedules, wheel-load information and operating documents needed by the project. Identify the destination requirements and the applicable design and inspection basis in the offer.

ACCEPTANCE

Standards and acceptance

Define the factory inspection, testing, acceptance records and site handover responsibilities for the ordered crane.

DELIVERY

Delivery and installation

Define packing, delivery access, unloading, assembly and commissioning responsibilities. Identify who prepares and checks the runway so that the crane installation can follow a practical site sequence.

SUPPORT

Warranty and spare parts

Include operator familiarisation, maintenance information and the required spare-parts support. Warranty coverage, service responsibilities and response arrangements should be stated in the written agreement for the selected order.

CONTINUE YOUR COMPARISON

Compare related
gantry arrangements.

All 16 double-girder gantry models ↗
07 / QUESTIONS BEFORE ORDERING

Choose the MGG
with the job in view.

Compare the handling task, selected lifting equipment and supply scope before ordering.

Does MGG have one trolley or two?

The MGG arrangement described here has twin truss main girders, one trolley and one winch. If the task needs two independently positioned lifting points, compare a dedicated double-trolley model.

Can a single hook handle a precast beam?

A suitable lifting beam and rigging may connect the hook to the element's lifting points. Their mass, geometry and required headroom must be included in the selected lifting arrangement.

Is MGG the same as MEH?

MGG uses a single trolley and single winch for construction lifting. MEH is a double-trolley truss gantry, making trolley spacing and the required handling modes additional selection points.

Can MGG be selected for spoil handling?

Specified piling-spoil work is one of its application areas. Describe the container, lifting connection and discharge process so that the attachment and operating cycle can be properly matched.

What determines the required rated load?

Start with the complete suspended assembly, including the load, lifting beam or container and rigging. The operating cycle and actual site arrangement are then considered with that lifting requirement.

Can the crane be planned for another site later?

Relocation requirements can be included in the enquiry. Delivery sections, assembly access and future runway conditions need to be agreed; a suitable arrangement at one site does not establish another site's fit.

Do you supply the rails and foundations?

The offer can identify the crane and runway supply boundaries. Agree rail provision, foundation design and installation responsibilities using the selected crane reactions and the site's civil information.

Which information is enough for an initial quotation?

Send the heaviest complete load, estimated rail spacing, useful hook height, intended task and destination. Mark uncertain dimensions clearly so the initial proposal can identify what needs confirmation.

08 / YOUR MGG GANTRY PROJECT

Get a quotation
for your MGG crane.

Tell us what you lift, the approximate span, the required lifting height and your destination. If a dimension is unknown, describe the task and leave that field open.

  • An arrangement matched to the lifting task
  • A clear equipment and service scope
  • Delivery and support terms in the offer

info@cranehenanmine.com

PRODUCT SELECTEDMGG engineering truss gantry crane

Not sure about a dimension? Leave it blank. A site sketch is helpful when available.

MGG gantry craneDiscuss your lifting task
Request a quote ↗
MGG equipment gallery
Enlarged MGG crane image

↑