Nacelle component mass and size
Wind Turbine Nacelle Production Crane
Wind-turbine main-unit production repeats large, precise moves and needs a crane layout that supports assembly takt without obstructing workstations.

Start with the component and the lift route.
Wind-turbine main-unit production repeats large, precise moves and needs a crane layout that supports assembly takt without obstructing workstations.
The lifted component, rigging, building clearances and control sequence need to be reviewed as one operating system.
Prepare the technical brief ↗Station plan and production takt
Runway and hook-approach geometry
Control and maintenance interfaces
Link nacelle assembly stations with stable, energy-conscious lifting.
Plan the crane coverage and travel sequence from the component and fixture positions. Full variable-frequency control provides smooth motion, while modular connections can support efficient installation and later maintenance.

Receive the component
Set pickup and laydown zones for major nacelle parts.
Carry through assembly
Travel between stations with controlled acceleration and clear sight lines.
Place at the fixture
Use slow movement to align the part and release only after support is confirmed.
Factory coverage
Verify hook approach, lift height and service reach for each assembly cell.
Electrical integration
Plan power, variable-frequency control and modular connections with the production building.
Windey wind-turbine production project
Henan Mine Crane supplied large-span, high-precision cranes for Windey's wind-turbine main-unit production and assembly, using full variable-frequency control and modular connections.





Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Nacelle component mass and size | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Station plan and production takt | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Runway and hook-approach geometry | Duty classification, speeds and control behaviour matched to the agreed operating cycle. |
| 04 / Site requirement | Control and maintenance interfaces | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane be configured for our powerhouse or factory?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗

























