Map each bay
Identify component masses, fixtures and movement between workstations.
A factory serving wind and solar projects needs cranes across several production bays, with stable movement and practical installation and maintenance.
Henan Mine Crane equipment for CRRC renewable-energy base
A factory serving wind and solar projects needs cranes across several production bays, with stable movement and practical installation and maintenance.
Plan the 18-unit fleet by work area and lift schedule. Use full variable-frequency control for smooth travel, modular construction for installation and shared service rules across the base.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Identify component masses, fixtures and movement between workstations.
Choose capacity and approach for each operating area.
Coordinate modular connections, tests and maintenance access.
These choices affect safety, process fit and the operating life of the installation.
Evaluate drives against actual cycles instead of relying on a broad savings claim.
Confirm power, runway and lifting access before delivery.
See how cranes and lifting systems were configured for demanding operating environments.

Eighteen high-precision cranes were supplied to a CRRC clean-energy base, with full variable-frequency control and modular electrical connections.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗