Classify the rooms
Confirm cleanliness target and the formal gas or dust classification.
Polysilicon production can demand both a clean environment and protection for classified gas or dust zones, with lifting equipment operating near sensitive process tools.
Henan Mine Crane equipment for Hongyuan Energy high-purity silicon project
Polysilicon production can demand both a clean environment and protection for classified gas or dust zones, with lifting equipment operating near sensitive process tools.
Separate the cleanliness and hazardous-area requirements, then combine them in the crane specification. Select sealed or low-particle components, explosion-protected drives and controls, and safe handling routes for each process room.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Confirm cleanliness target and the formal gas or dust classification.
Select hoist and attachment arrangements for equipment maintenance and material transfer.
Test cleaning, electrical protection and operating interlocks at the site.
These choices affect safety, process fit and the operating life of the installation.
Review surface finish, lubrication, collection and cleaning access.
Match component certificates to the exact site classification.
See how cranes and lifting systems were configured for demanding operating environments.

A 54-crane package for a 100,000-ton high-purity crystalline-silicon project included cleanroom explosion-proof double-girder hoist cranes and dust explosion-proof single-girder cranes.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.

Control ignition and particle release in the same bay.
Review product details ↗
Double-girder coverage with an explosion-proof hoist.
Review product details ↗
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.