Identify the item
Use scanning and visual checks to match a load with its warehouse record.
Power projects store cable and other electrical items with changing locations, so an automated crane must know both the load and its destination.
Henan Mine Crane equipment for Electrical equipment warehouse project
Power projects store cable and other electrical items with changing locations, so an automated crane must know both the load and its destination.
Connect a scanning-equipped crane to WCS dispatch and WMS inventory records. Position feedback, intelligent lifting gear, obstacle detection and anti-sway allow each pickup and release to be logged and supervised from the control room.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Use scanning and visual checks to match a load with its warehouse record.
Engage the monitored attachment and follow the assigned route with obstacle checks.
Confirm placement and write the movement to the inventory system.
These choices affect safety, process fit and the operating life of the installation.
Define how load identity, position and exception states pass between crane, WCS and WMS.
Test the detection switch and release logic with actual cable packages.
See how cranes and lifting systems were configured for demanding operating environments.

The project used two automated cranes for a power project handling cables for box-type substations, using PLC control, 3D scanning, visual detection, WCS scheduling and WMS records.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗