Measure the slab
Check width, thickness, temperature and surface condition before choosing the clamp.
Slabs leaving steel production can exceed 650 C, making the clamp, structure and control system part of the thermal risk plan.
Henan Mine Crane equipment for Shandong Iron and Steel Rizhao slab-handling project
Slabs leaving steel production can exceed 650 C, making the clamp, structure and control system part of the thermal risk plan.
Use an adjustable slab clamp matched to slab width and a double-trolley crane arrangement suited to the lifting sequence. Guided movement, digital speed control and monitoring support precise pickup and set-down in the hot bay.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Check width, thickness, temperature and surface condition before choosing the clamp.
Verify clamp engagement and load balance while moving through the bay.
Position the slab over its support and confirm the planned release.
These choices affect safety, process fit and the operating life of the installation.
Select material and component protection for the hot-slab temperature range.
Reserve weighing, sensing and positioning data interfaces where required.
See how cranes and lifting systems were configured for demanding operating environments.

A 50+50 t slab-clamp crane entered service at the Rizhao steel base, using adjustable clamps, monitoring, weighing and digital speed control for slabs that can exceed 650 C.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗