Carbon Anode Material Crane Acceptance Solution

A carbon-anode-material project needs cranes whose fabrication, dimensions and running gear can be checked against the building and process duty before installation.

Henan Mine Crane equipment for Lanzhou Baohang negative-electrode project

THE LIFTING SOLUTION

Specify and verify lifting equipment for a carbon-material production line.

A carbon-anode-material project needs cranes whose fabrication, dimensions and running gear can be checked against the building and process duty before installation.

Develop an acceptance plan alongside the crane layout. Review design records and material reports, measure span and wheel geometry, and test the running mechanisms before the equipment is released to site.

HANDLING SEQUENCE

How the solution works.

Follow the load through the operation to see where lifting equipment, tooling and controls must work together.

01

Set design inputs

Confirm loads, process route and runway drawings for the material line.

02

Inspect fabrication

Review material, welding and non-destructive-test records.

03

Measure and test

Check span, brake wheel, wheel tread and travel mechanism against agreed criteria.

ENGINEERING DECISIONS

What determines the final configuration?

These choices affect safety, process fit and the operating life of the installation.

01

Document control

Link each inspection result to the correct crane and project drawing.

02

Installation fit

Resolve dimensional exceptions before shipping to the production plant.

DELIVERED PROJECTS

Experience on real jobs.

See how cranes and lifting systems were configured for demanding operating environments.

Lanzhou Baohang carbon materials crane project from Henan Mine Crane's new energy and advanced materials application case
PROJECT 01

Lanzhou Baohang negative-electrode project

Cranes for a 100,000-ton negative-electrode-material project underwent acceptance checks on material records, NDT reports, main-girder span, brake-wheel runout and wheel hardness.

RELEVANT EQUIPMENT

Equipment options for this solution.

These product families support the handling tasks above. The final crane and attachment are selected from the site brief.

SPECIFICATION BRIEF

What we need to size your crane.

Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.

Prepare your enquiry ↗
  1. 01Equipment schedule and loads
  2. 02Building/runway tolerances
  3. 03Inspection and NDT records
  4. 04Factory acceptance criteria