Where it fits
Precast and construction yards
MEH uses a lattice girder and two trolleys to move long components across an outdoor work area. The lifting plan must address tandem loading, travel path, wind exposure and the transport size of the assembled crane sections.
PRODUCT CONFIGURATION / MEHMEH uses a lattice girder and two trolleys to move long components across an outdoor work area. The lifting plan must address tandem loading, travel path, wind exposure and the transport size of the assembled crane sections.
Precast and construction yards
Truss / two trolleys with Two hooks.
Size the crane against the load, installation geometry and work cycle. The final equipment schedule follows the project drawings and operating brief.
Precast and construction yards
Compare the Gantry Cranes range ↗Share the maximum lifted mass, load dimensions, center of gravity and any grab, magnet, spreader or lifting beam.
Confirm rail gauge, runway length, foundation capacity, cantilever and end approaches.
State typical load, lifts per hour, travel distance, shifts, control position and site power supply.
Tandem lift; wind; transport sections
Review the equipment arrangement alongside your proposed site layout and lifting route.


Send the load schedule and site drawings. We can configure the crane, lifting system and installation interface for your operating conditions.
Request a technical proposal ↗