Move fabricated sections
Define lift points and temporary supports for the largest tunneling-machine parts.
Non-excavation equipment manufacturing needs repeated movement of large structures through fabrication and assembly, often across several tall workshop bays.
Henan Mine Crane equipment for Tangxing Equipment production park
Non-excavation equipment manufacturing needs repeated movement of large structures through fabrication and assembly, often across several tall workshop bays.
Plan the crane fleet from the component route, building columns and assembly stations. Allocate capacity to each bay, allow controlled positioning of large parts and standardize service where the installed fleet grows.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Define lift points and temporary supports for the largest tunneling-machine parts.
Provide hook coverage at welding and final assembly stations.
Coordinate runway traffic and inspections across the fleet.
These choices affect safety, process fit and the operating life of the installation.
Check hook approach and lifting height within the 25 m high workshop environment.
Keep spare parts and inspection procedures coherent across many installed cranes.
See how cranes and lifting systems were configured for demanding operating environments.

Henan Mine Crane delivered more than 100 heavy cranes for Tangxing's non-excavation equipment park, where they support tunneling-equipment production in high steel-structure workshops.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗