Skip to content
Henan mine crane co., ltd. Get a project quote
FACTORY CRANE SOLUTIONS

Tunneling Equipment Factory Crane Fleet

Non-excavation equipment manufacturing needs repeated movement of large structures through fabrication and assembly, often across several tall workshop bays.

ApplicationTangxing Equipment production park
Project equipmentBuilt for this handling task
Site-specificLoad, route, duty and delivery scope
Heavy overhead crane installed in a tunneling equipment factory
Heavy overhead crane installed in a tunneling equipment factory.
THE OPERATING CHALLENGE

Start with the load and the production route.

Non-excavation equipment manufacturing needs repeated movement of large structures through fabrication and assembly, often across several tall workshop bays.

The lifted load, rigging, building clearances and control sequence need to be reviewed as one operating system.

Prepare the technical brief ↗
01 / DEFINE

Largest machine component and rigging

02 / DEFINE

Bay heights and runway plan

03 / DEFINE

Assembly schedule

04 / DEFINE

Fleet maintenance and traffic rules

ENGINEERED FOR THE APPLICATION

Serve large tunneling-machine assemblies across a high-bay factory.

Plan the crane fleet from the component route, building columns and assembly stations. Allocate capacity to each bay, allow controlled positioning of large parts and standardize service where the installed fleet grows.

Heavy overhead crane installed in a tunneling equipment factory
Heavy overhead crane installed in a tunneling equipment factory.
01

Move fabricated sections

Define lift points and temporary supports for the largest tunneling-machine parts.

02

Feed assembly

Provide hook coverage at welding and final assembly stations.

03

Maintain throughput

Coordinate runway traffic and inspections across the fleet.

✓

High-bay geometry

Check hook approach and lifting height within the 25 m high workshop environment.

✓

Fleet support

Keep spare parts and inspection procedures coherent across many installed cranes.

PROJECT IN OPERATION

Tangxing Equipment production park

Henan Mine Crane delivered more than 100 heavy cranes for Tangxing's non-excavation equipment park, where they support tunneling-equipment production in high-bay steel-structure workshops.

Process fitTunneling Equipment Factory Crane Fleet Solution
EquipmentKSQ New-Design Hook Overhead Crane / QE Double-Trolley Hook Overhead Crane
ProjectTangxing Equipment production park
Technical reviewCustomer load and site drawings
SPECIFICATION FOR YOUR SITE

Define the operating brief before fixing a crane model.

Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.

InputInformation needed for this applicationConfirm in the technical offer
01 / Site requirementLargest machine component and riggingRated load including the attachment, lifting-point arrangement and load cases.
02 / Site requirementBay heights and runway planCrane span, lifting height, headroom, wheel loads and runway or foundation interfaces.
03 / Site requirementAssembly scheduleDuty classification, speeds and control behaviour matched to the agreed operating cycle.
04 / Site requirementFleet maintenance and traffic rulesFleet maintenance access, inspection windows, shared-runway traffic rules, control authority and fault recovery agreed for each bay.
Destination and deliveryCountry, project standards, quantity, freight and site services.Documents, inspection and testing, packing, installation support and agreed delivery milestones.
Have a preliminary layout?

Send the available load schedule and drawings. The missing inputs can be identified during technical review.

Discuss your project ↗
FROM OFFER TO HANDOVER

Compare the complete lifting package.

The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.

01

Engineering

General arrangement, load basis, runway and utility interfaces, control and protection schedule.

02

Manufacture & inspection

Approved drawings, inspection plan and factory testing for the selected configuration.

03

Shipping & site work

Packing, freight, erection support, commissioning and operator training as specified.

04

Handover

Test records, manuals, maintenance instructions and agreed spare-parts list.

Order quantity, compliance and delivery schedule

Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.

BUYER QUESTIONS

Before you request a quotation.

What information is needed to specify this crane solution?

Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.

Can the lifting system be configured for our load and factory?

Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.

What are the order quantity, certification and lead time?

We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.

LET'S REVIEW YOUR PROJECT

Send your project brief. Get a crane proposal built around your process.

Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.

Send your project requirements ↗