Steel stock sizes and surface condition
Automated Electro-Permanent Magnet Beam Handling
Steel stock handling requires repeatable pickup, accurate placement and a safe response if electrical supply is interrupted.

Start with the load and the production route.
Steel stock handling requires repeatable pickup, accurate placement and a safe response if electrical supply is interrupted.
The lifted load, rigging, building clearances and control sequence need to be reviewed as one operating system.
Prepare the technical brief ↗Map every pickup and set-down position and define the route between them.
Define how the load is retained after power loss and how grip status is checked before movement.
Multi-crane avoidance rules
Move steel stock automatically with retained magnetic grip.
Configure a guided electromagnetic-beam crane around the stock dimensions and destination map. Electro-permanent magnets, rigid guidance, dual hoist motors and collision avoidance support automatic task dispatch with selectable local and remote modes.

Select the stock
Determine dimensions and pickup pattern for each target load.
Grip and travel
Verify magnet engagement before guided, anti-sway movement.
Release at destination
Check the target position and safe demagnetization sequence.
Magnetic holding
Test grip and release for the actual steel surface and interruption case.
Shared runway
Define avoidance and dispatch rules when several cranes work in one bay.
Automated magnetic-beam crane development
The project used an in-house automated magnetic-beam crane with rigid-guided anti-sway, electro-permanent lifting gear, dual hoist motors and multiple control modes.





Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Steel stock sizes and surface condition | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Map every pickup and set-down position and define the route between them. | Pickup/set-down coordinates, work routes, hook coverage and permitted obstructions. |
| 03 / Site requirement | Define how the load is retained after power loss and how grip status is checked before movement. | Magnet holding/release behaviour, power-loss response, contact conditions and acceptance tests. |
| 04 / Site requirement | Multi-crane avoidance rules | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.




Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the lifting system be configured for our load and factory?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗





















