Skip to content
Henan mine crane co., ltd. Get a project quote
FACTORY CRANE SOLUTIONS

Automated Electro-Permanent Magnet Beam Handling

Steel stock handling requires repeatable pickup, accurate placement and a safe response if electrical supply is interrupted.

ApplicationAutomated magnetic-beam crane development
Project equipmentBuilt for this handling task
Site-specificLoad, route, duty and delivery scope
Automated overhead crane with an electro-permanent magnet lifting beam
Automated overhead crane with an electro-permanent magnet lifting beam.
THE OPERATING CHALLENGE

Start with the load and the production route.

Steel stock handling requires repeatable pickup, accurate placement and a safe response if electrical supply is interrupted.

The lifted load, rigging, building clearances and control sequence need to be reviewed as one operating system.

Prepare the technical brief ↗
01 / DEFINE

Steel stock sizes and surface condition

02 / DEFINE

Map every pickup and set-down position and define the route between them.

03 / DEFINE

Define how the load is retained after power loss and how grip status is checked before movement.

04 / DEFINE

Multi-crane avoidance rules

ENGINEERED FOR THE APPLICATION

Move steel stock automatically with retained magnetic grip.

Configure a guided electromagnetic-beam crane around the stock dimensions and destination map. Electro-permanent magnets, rigid guidance, dual hoist motors and collision avoidance support automatic task dispatch with selectable local and remote modes.

Automated overhead crane with an electro-permanent magnet lifting beam
Automated overhead crane with an electro-permanent magnet lifting beam.
01

Select the stock

Determine dimensions and pickup pattern for each target load.

02

Grip and travel

Verify magnet engagement before guided, anti-sway movement.

03

Release at destination

Check the target position and safe demagnetization sequence.

✓

Magnetic holding

Test grip and release for the actual steel surface and interruption case.

✓

Shared runway

Define avoidance and dispatch rules when several cranes work in one bay.

PROJECT IN OPERATION

Automated magnetic-beam crane development

The project used an in-house automated magnetic-beam crane with rigid-guided anti-sway, electro-permanent lifting gear, dual hoist motors and multiple control modes.

Process fitAutomated Electro-Permanent Magnet Beam Handling Solution
EquipmentElectromagnetic Carrier-Beam Overhead Crane / Upper-Rotating Electromagnetic Beam Crane
ProjectAutomated magnetic-beam crane development
Technical reviewCustomer load and site drawings
SPECIFICATION FOR YOUR SITE

Define the operating brief before fixing a crane model.

Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.

InputInformation needed for this applicationConfirm in the technical offer
01 / Site requirementSteel stock sizes and surface conditionRated load including the attachment, lifting-point arrangement and load cases.
02 / Site requirementMap every pickup and set-down position and define the route between them.Pickup/set-down coordinates, work routes, hook coverage and permitted obstructions.
03 / Site requirementDefine how the load is retained after power loss and how grip status is checked before movement.Magnet holding/release behaviour, power-loss response, contact conditions and acceptance tests.
04 / Site requirementMulti-crane avoidance rulesProtection, positioning, interlocks, monitoring and safe recovery requirements.
Destination and deliveryCountry, project standards, quantity, freight and site services.Documents, inspection and testing, packing, installation support and agreed delivery milestones.
Have a preliminary layout?

Send the available load schedule and drawings. The missing inputs can be identified during technical review.

Discuss your project ↗
FROM OFFER TO HANDOVER

Compare the complete lifting package.

The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.

01

Engineering

General arrangement, load basis, runway and utility interfaces, control and protection schedule.

02

Manufacture & inspection

Approved drawings, inspection plan and factory testing for the selected configuration.

03

Shipping & site work

Packing, freight, erection support, commissioning and operator training as specified.

04

Handover

Test records, manuals, maintenance instructions and agreed spare-parts list.

Order quantity, compliance and delivery schedule

Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.

BUYER QUESTIONS

Before you request a quotation.

What information is needed to specify this crane solution?

Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.

Can the lifting system be configured for our load and factory?

Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.

What are the order quantity, certification and lead time?

We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.

LET'S REVIEW YOUR PROJECT

Send your project brief. Get a crane proposal built around your process.

Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.

Send your project requirements ↗