750 t Heavy Fabrication Gantry Solution

A 750 t yard lift can challenge wheel loads, travel control and power supply before the first component is moved.

Henan Mine Crane equipment for Zhejiang 750 t gantry project

THE LIFTING SOLUTION

Move extremely heavy assemblies while managing runway pressure.

A 750 t yard lift can challenge wheel loads, travel control and power supply before the first component is moved.

Coordinate the gantry, runway and supply system as one package. Multi-point synchronized lifting, monitored travel, a site-specific dual-rail arrangement and regenerative power are evaluated against the real lifting cycle.

HANDLING SEQUENCE

How the solution works.

Follow the load through the operation to see where lifting equipment, tooling and controls must work together.

01

Establish the heavy lift

Calculate assembly, rigging and support loads at each pickup point.

02

Move across the site

Balance lifting points and control gantry travel over the chosen rail layout.

03

Set down safely

Monitor load distribution and movement through final placement.

ENGINEERING DECISIONS

What determines the final configuration?

These choices affect safety, process fit and the operating life of the installation.

01

Runway pressure

Verify the single-side dual-rail arrangement against civil design and wheel loads.

02

Power and recovery

Check the 10 kV supply, regeneration and safe response to power interruption.

DELIVERED PROJECTS

Experience on real jobs.

See how cranes and lifting systems were configured for demanding operating environments.

Crane application in industrial manufacturing from Henan Mine Crane's industrial manufacturing application case
PROJECT 01

Zhejiang 750 t gantry project

The project used a 750 t double-girder gantry in service at a Zhejiang project, with synchronized multi-point lifting, a single-side dual-rail design and 10 kV power with energy recovery.

RELEVANT EQUIPMENT

A crane engineered for this heavy lift.

The final structure, lifting gear and controls follow the project load schedule and site drawings.

This heavy lift requires a project-specific crane configuration. Share the load schedule, drawings and site conditions so the structural and lifting arrangement can be engineered for the application.

Discuss your lift ↗
SPECIFICATION BRIEF

What we need to size your crane.

Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.

Prepare your enquiry ↗
  1. 01Full assembly and rigging mass
  2. 02Civil and wheel-load limits
  3. 03Lift-point spacing and route
  4. 04Electrical supply and recovery plan
NEXT STEP

Tell us what your crane needs to lift.

Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.