Skip to content
CRANE MANUFACTURER SINCE 2002
info@hnksglobal.com+86 188 3620 7779Project enquiry ↗
Henan Mine Crane Request a quote
Wanli New Energy Smart Dry Port crane project from Henan Mine Crane's warehousing and logistics application case
PORTS & LOGISTICS / LIFTING SOLUTIONS

Smart Dry Port Container Handling Solution

A dry port must move containers across truck lanes and stacks without lifting a trailer or losing control of the spreader.

Henan Mine Crane equipment for Wanli New Energy Smart Dry Port

THE LIFTING SOLUTION

Handle daily dry-port traffic with controlled container positioning.

A dry port must move containers across truck lanes and stacks without lifting a trailer or losing control of the spreader.

Use a rail-mounted container gantry with variable-frequency travel, PLC control, anti-sway and truck anti-lift protection. Coordinate automatic container search and spreader guidance with the terminal's operating positions.

HANDLING SEQUENCE

How the solution works.

Follow the load through the operation to see where lifting equipment, tooling and controls must work together.

01

Receive the vehicle

Identify the container and confirm the truck has reached a safe transfer position.

02

Lift and travel

Monitor spreader engagement and sway as the container moves to its stack.

03

Set down accurately

Guide the spreader to the assigned slot and verify release.

ENGINEERING DECISIONS

What determines the final configuration?

These choices affect safety, process fit and the operating life of the installation.

01

Truck interface

Specify anti-lift safeguards and sight lines around each lane.

02

Monitoring and control

Agree remote operation, status signals and recovery from interrupted moves.

DELIVERED PROJECTS

Experience on real jobs.

See how cranes and lifting systems were configured for demanding operating environments.

Wanli New Energy Smart Dry Port crane project from Henan Mine Crane's warehousing and logistics application case
PROJECT 01

Wanli New Energy Smart Dry Port

Henan Mine Crane delivered a rail-mounted container gantry to the Wanli Dry Port project, whose planned annual throughput was 5 million tons; the crane used PLC control, remote monitoring and container guidance.

RELEVANT EQUIPMENT

Equipment options for this solution.

These product families support the handling tasks above. The final crane and attachment are selected from the site brief.

SPECIFICATION BRIEF

What we need to size your crane.

Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.

Prepare your enquiry ↗
  1. 01Container mix and gross mass
  2. 02Truck lanes and rail gauge
  3. 03Stack height and annual/peak moves
  4. 04Remote-control and vehicle safeguards
NEXT STEP

Tell us what your crane needs to lift.

Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.

Start a project enquiry ↗