Skip to content
CRANE MANUFACTURER SINCE 2002
info@hnksglobal.com+86 188 3620 7779Project enquiry ↗
Henan Mine Crane Request a quote
Crane application in construction and infrastructure from Henan Mine Crane's construction and infrastructure application case
INFRASTRUCTURE / LIFTING SOLUTIONS

Metro Shaft Spoil Removal Gantry Solution

Metro construction needs repetitive vertical lifting where personnel, vehicles and shaft-edge geometry create distinct hazards.

Henan Mine Crane equipment for Guangfo intercity rail project

THE LIFTING SOLUTION

Lift spoil and construction supplies from a deep rail-worksite shaft.

Metro construction needs repetitive vertical lifting where personnel, vehicles and shaft-edge geometry create distinct hazards.

Configure a dual-girder spoil gantry around the shaft, bucket or lifting gear and surface transfer point. Define the under-rail lift depth, hoist travel, controlled release and protected walking/vehicle routes.

HANDLING SEQUENCE

How the solution works.

Follow the load through the operation to see where lifting equipment, tooling and controls must work together.

01

Fill below grade

Check bucket capacity and lifting attachment at the excavation level.

02

Hoist through the shaft

Manage the vertical path and shaft-edge clearance.

03

Discharge at surface

Move spoil to the planned vehicle or stockpile point.

ENGINEERING DECISIONS

What determines the final configuration?

These choices affect safety, process fit and the operating life of the installation.

01

Deep lift

The 40 m under-rail depth requires a verified rope, drum and travel plan.

02

Site protection

Define limits, alarms and exclusion areas around the shaft and surface route.

DELIVERED PROJECTS

Experience on real jobs.

See how cranes and lifting systems were configured for demanding operating environments.

Crane application in construction and infrastructure from Henan Mine Crane's construction and infrastructure application case
PROJECT 01

Guangfo intercity rail project

The project used two 100 t dual-girder gantries for spoil and material handling on the Guangfo intercity rail project, with under-rail lift depth up to 40 m.

RELEVANT EQUIPMENT

Equipment options for this solution.

These product families support the handling tasks above. The final crane and attachment are selected from the site brief.

SPECIFICATION BRIEF

What we need to size your crane.

Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.

Prepare your enquiry ↗
  1. 01Spoil bucket and other load schedule
  2. 02Shaft depth and edge geometry
  3. 03Surface vehicle route
  4. 04Hoist, limit and emergency requirements
NEXT STEP

Tell us what your crane needs to lift.

Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.

Start a project enquiry ↗