Maximum segment and rigging mass
700 t Bridge Steel Tower Gantry
A suspension-bridge steel tower calls for very heavy segment lifting while the construction site and temporary works constrain runway position and lift height.

Start with the load and the process route.
A suspension-bridge steel tower calls for very heavy segment lifting while the construction site and temporary works constrain runway position and lift height.
The load, lifting attachment, building interface and operating sequence need to be reviewed together.
Prepare the technical brief ↗Tower erection sequence
Runway foundations and span
Wind and high-lift operating plan
Lift and place large steel-tower sections with a matched site gantry.
Plan the 700 t gantry from the largest tower segment, staging area and erection sequence. Coordinate span, high lift, wheel loads and wind operating limits with the civil and installation teams.

Stage the segment
Set pickup points and supports in the fabrication or laydown zone.
Travel to the tower
Check gantry path against temporary works and exclusion areas.
Place under control
Align the segment with the erected structure and confirm support.
Civil interface
Verify rail foundations and wheel loads at each stage of construction.
Wind and height
Define safe operating limits for tall, exposed lifts.
Zhangjinggao Yangtze River Bridge steel tower
The project used a 700 t gantry crane that passed type testing for the Zhangjinggao bridge project and was intended for main steel-tower structure lifting.




Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Maximum segment and rigging mass | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Tower erection sequence | Lift sequence, pickup and placement positions, staging areas and clearance at each construction stage. |
| 03 / Site requirement | Runway foundations and span | Rail gauge and alignment, wheel reactions, foundation design loads, span and the agreed civil interfaces. |
| 04 / Site requirement | Wind and high-lift operating plan | Operating and parked wind limits, storm restraint, lifting-height limits and the agreed high-lift procedure. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane system be configured for our site and process?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗























