Component and rigging mass
500 t High-Speed Rail Construction Lifting
High-speed rail construction may combine very heavy components, high lift and damp or dusty work areas, leaving little tolerance for load swing.

Start with the load and the process route.
High-speed rail construction may combine very heavy components, high lift and damp or dusty work areas, leaving little tolerance for load swing.
The load, lifting attachment, building interface and operating sequence need to be reviewed together.
Prepare the technical brief ↗Tunnel or site clearance
Lift height and hook spacing
Dust, moisture and monitoring scope
Position heavy rail-infrastructure components in a demanding site environment.
Build the 500 t double-girder lift plan from the component, tunnel or worksite route and the final placement point. Synchronize hooks, select low-speed control and monitor the operation through the complete construction cycle.

Prepare the segment
Confirm rigging, total mass and lift-point balance.
Lift through the route
Use high lift and synchronized hooks with anti-sway control.
Align at placement
Reduce speed and observe load and crane status before final release.
Site conditions
Check humidity, dust, temporary power and access before selecting components.
Lift precision
Define acceptable swing and placement tolerances in the site method statement.
High-speed rail construction project
The project used a 500 t new-design double-girder crane placed into service at a high-speed rail project, with synchronized hooks, electrical anti-sway and digital and visual monitoring.


Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Component and rigging mass | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Tunnel or site clearance | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Lift height and hook spacing | Highest and lowest hook positions, hook spacing, lifting-point geometry and the permitted coordinated operating modes. |
| 04 / Site requirement | Dust, moisture and monitoring scope | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane system be configured for our site and process?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗

























