Large cable-stayed-bridge tower modules need heavy controlled lifts at fabrication and preassembly stations before erection.
Henan Mine Crane equipment for Ma'anshan Yangtze rail-road bridge
Large cable-stayed-bridge tower modules need heavy controlled lifts at fabrication and preassembly stations before erection.
Size the gantry fleet from the heaviest tower section and site layout. Coordinate several gantries so fabrication, trial assembly and dispatch can proceed without conflicting load paths.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Confirm lifting points and support frames for each steel section.
Assign gantry paths and waiting zones in the fabrication yard.
Position sections for trial assembly and inspection before release.
These choices affect safety, process fit and the operating life of the installation.
Define traffic and lift-plan boundaries for concurrent equipment.
Check bearing and alignment of the segment at every hand-off.
See how cranes and lifting systems were configured for demanding operating environments.

The project involved more than ten gantry cranes, including 500 t and 400 t units, for main steel-tower work; a Z3 tower-section trial assembly passed inspection.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗