Steel section dimensions and mass
500 t Bridge Tower Assembly Gantry
Large cable-stayed-bridge tower modules need heavy controlled lifts at fabrication and preassembly stations before erection.

Start with the load and the process route.
Large cable-stayed-bridge tower modules need heavy controlled lifts at fabrication and preassembly stations before erection.
The load, lifting attachment, building interface and operating sequence need to be reviewed together.
Prepare the technical brief ↗Yard/runway plan
Concurrent crane schedule
Trial-assembly tolerances
Move major steel-tower sections through bridge fabrication and assembly.
Size the gantry fleet from the heaviest tower section and site layout. Coordinate several gantries so fabrication, trial assembly and dispatch can proceed without conflicting load paths.

Pick the module
Confirm lifting points and support frames for each steel section.
Travel through assembly
Assign gantry paths and waiting zones in the fabrication yard.
Set for fit-up
Position sections for trial assembly and inspection before release.
Multiple cranes
Define traffic and lift-plan boundaries for concurrent equipment.
Temporary support
Check bearing and alignment of the segment at every hand-off.
Ma'anshan Yangtze rail-road bridge
The project involved more than ten gantry cranes, including 500 t and 400 t units, for main steel-tower work; a Z3 tower-section trial assembly passed inspection.


Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Steel section dimensions and mass | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Yard/runway plan | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Concurrent crane schedule | Duty classification, speeds and control behaviour matched to the agreed operating cycle. |
| 04 / Site requirement | Trial-assembly tolerances | Protection, positioning, interlocks, monitoring and safe recovery requirements. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane system be configured for our site and process?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗
























