Skip to content
CRANE MANUFACTURER SINCE 2002
info@hnksglobal.com+86 188 3620 7779Project enquiry ↗
Henan Mine Crane Request a quote
Crane application in steel and metallurgy from Henan Mine Crane's steel and metallurgy application case
STEEL & METALLURGY / LIFTING SOLUTIONS

Automated Ferroalloy Furnace Charging Solution

Ferroalloy charging combines frequent raw-material pickups with a harsh process area where manual hook handling slows the cycle.

Henan Mine Crane equipment for Ulanqab ferroalloy project

THE LIFTING SOLUTION

Move ferroalloy charge material through a controlled, remote sequence.

Ferroalloy charging combines frequent raw-material pickups with a harsh process area where manual hook handling slows the cycle.

Design the crane, grab or charging attachment, hopper locations and remote control as one process cell. Automatic pickup, travel and release are governed by position feedback and anti-sway control, while operators supervise from a safer location.

HANDLING SEQUENCE

How the solution works.

Follow the load through the operation to see where lifting equipment, tooling and controls must work together.

01

Locate feed points

Record the charging bin, pickup position and receiving hopper for each material.

02

Automate the move

Coordinate attachment engagement, travel and positioning before releasing the charge.

03

Confirm the cycle

Test repeatability, visibility, fault response and safe manual recovery with the real material.

ENGINEERING DECISIONS

What determines the final configuration?

These choices affect safety, process fit and the operating life of the installation.

01

Positioning accuracy

The attachment must reach the hopper consistently without striking process equipment.

02

Remote safety

Define monitored operating zones, interlocks and recovery after a failed pickup.

DELIVERED PROJECTS

Experience on real jobs.

See how cranes and lifting systems were configured for demanding operating environments.

Crane application in steel and metallurgy from Henan Mine Crane's steel and metallurgy application case
PROJECT 01

Ulanqab ferroalloy project

Multiple automated metallurgical cranes were placed into service for a ferrochrome project in Ulanqab, with remote centralized control for hook engagement, charging and material transfer.

RELEVANT EQUIPMENT

Equipment options for this solution.

These product families support the handling tasks above. The final crane and attachment are selected from the site brief.

SPECIFICATION BRIEF

What we need to size your crane.

Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.

Prepare your enquiry ↗
  1. 01Material and container dimensions
  2. 02Hopper layout and travel distance
  3. 03Charging cycles per shift
  4. 04Remote-control and interlock requirements
NEXT STEP

Tell us what your crane needs to lift.

Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.

Start a project enquiry ↗