Skip to content
Henan mine crane co., ltd. Get a project quote
STEEL MILL CRANES

Fully Automated Coke Pot Handling

Coke pot handling repeats high-temperature movements where operator exposure and load swing can disrupt the charging or quenching sequence.

ApplicationAutomated coke pot crane installation
Installed equipmentProject-specific lifting arrangement
Site-specificLoad, route, duty and delivery scope
Automated coke pot handling installation in a steel plant
Automated coke pot handling installation in a steel plant.
THE OPERATING CHALLENGE

Start with the load and the process route.

Coke pot handling repeats high-temperature movements where operator exposure and load swing can disrupt the charging or quenching sequence.

The crane, lifting attachment, building interface and control sequence need to be reviewed as one operating system.

Prepare the technical brief ↗
01 / DEFINE

Filled pot and lifting gear mass

02 / DEFINE

Furnace and discharge coordinates

03 / DEFINE

Thermal exposure and cycle time

04 / DEFINE

Video, control and recovery requirements

ENGINEERED FOR THE APPLICATION

Transfer coke pots with remote supervision and controlled anti-sway.

Use a purpose-designed pot crane with variable-frequency travel, precise position feedback and a coordinated electrical and mechanical anti-sway system. Video supervision and human-machine controls allow the route to run automatically while retaining a recovery procedure.

Automated coke pot handling installation in a steel plant
Automated coke pot handling installation in a steel plant.
01

Define pot pickup

Confirm pot geometry, lifted mass and engagement points at the furnace side.

02

Run the programmed route

Control acceleration and sway through the transfer path with position checks.

03

Set down and verify

Confirm the release point and reset the crane for the next pot without exposing staff to the hot zone.

✓

Heat and visibility

Select components and camera views for the actual thermal exposure and sight lines.

✓

Exception handling

Provide supervised recovery for a missed engagement or blocked route.

PROJECT IN OPERATION

Automated coke pot crane installation

Two fully automated coke pot cranes supplied by Henan Mine Crane entered service at a coking facility, using variable-frequency drive, video monitoring and anti-sway control.

Process fitFully Automated Coke Pot Handling Solution
EquipmentMetallurgical Overhead Crane / Double-Girder Casting Crane
ProjectAutomated coke pot crane installation
Technical reviewCustomer load and site drawings
SPECIFICATION FOR YOUR SITE

Define the operating brief before fixing a crane model.

Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.

InputInformation needed for this applicationConfirm in the technical offer
01 / Load and attachmentFilled pot and lifting gear massRated load including the attachment, lifting-point arrangement and load cases.
02 / Plant geometryFurnace and discharge coordinatesCrane span, lifting height, headroom, wheel loads and runway or foundation interfaces.
03 / Operating dutyThermal exposure and cycle timeDuty classification, speeds and control behaviour matched to the agreed operating cycle.
04 / Environment and controlsVideo, control and recovery requirementsProtection, positioning, interlocks, monitoring and safe recovery requirements.
Destination and deliveryCountry, project standards, quantity, freight and site services.Documents, inspection and testing, packing, installation support and agreed delivery milestones.
Have a preliminary layout?

Send the available load schedule and drawings. The missing inputs can be identified during technical review.

Discuss your project ↗
FROM OFFER TO HANDOVER

Compare the complete lifting package.

The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.

01

Engineering

General arrangement, load basis, runway and utility interfaces, control and protection schedule.

02

Manufacture & inspection

Approved drawings, inspection plan and factory testing for the selected configuration.

03

Shipping & site work

Packing, freight, erection support, commissioning and operator training as specified.

04

Handover

Test records, manuals, maintenance instructions and agreed spare-parts list.

Order quantity, compliance and delivery schedule

Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.

RELATED CRANES AND SOLUTIONS

Compare equipment for this operating task.

These product families and related applications provide a starting point. Final selection follows the load and site review.

BUYER QUESTIONS

Before you request a quotation.

What information is needed to specify this crane solution?

Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.

Can the crane be customized for our plant?

Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.

What are the order quantity, certification and lead time?

We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.

LET'S REVIEW YOUR PROJECT

Send the fully automated coke pot handling brief. Get a crane proposal built around your process.

Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.

Send your project requirements ↗