Skip to content
Henan mine crane co., ltd. Get a project quote
STEEL MILL CRANES

Blast Furnace Grab Crane Automation

A blast-furnace material bay can be hot, humid and misty, making direct visual control and repeatable grab placement difficult.

ApplicationGuangxi Chiji blast-furnace project
Installed equipmentProject-specific lifting arrangement
Site-specificLoad, route, duty and delivery scope
Grab overhead crane operating above a blast furnace material handling area
Grab overhead crane operating above a blast furnace material handling area.
THE OPERATING CHALLENGE

Start with the load and the process route.

A blast-furnace material bay can be hot, humid and misty, making direct visual control and repeatable grab placement difficult.

The crane, lifting attachment, building interface and control sequence need to be reviewed as one operating system.

Prepare the technical brief ↗
01 / DEFINE

Bulk material and grab volume

02 / DEFINE

Bay plan and receiving points

03 / DEFINE

Temperature, humidity and mist conditions

04 / DEFINE

Remote operation and fallback sequence

ENGINEERED FOR THE APPLICATION

Automate burden transfer despite heat, humidity and poor visibility.

Match a heavy grab crane to the burden containers and transfer points. Combine PLC control, positioning, anti-sway and environmental sensing so grabbing and discharge remain controlled during low-visibility operation.

Grab overhead crane operating above a blast furnace material handling area
Grab overhead crane operating above a blast furnace material handling area.
01

Identify the burden

Define bulk-material density, grab fill and the pickup profile.

02

Transfer remotely

Move the loaded grab along a programmed route with position and obstacle checks.

03

Discharge predictably

Control release above the receiving point and record the cycle for remote supervisors.

✓

Harsh-environment structure

Account for heat, humidity, mist and fatigue in the bridge and mechanisms.

✓

Visibility-independent control

Validate sensors and safe fallback when camera or position data is degraded.

PROJECT IN OPERATION

Guangxi Chiji blast-furnace project

Four 32 t intelligent grab cranes were supplied within a 59-crane package for Guangxi Chiji Steel's 2060 m³ blast-furnace project, with remote scheduling and low-visibility automatic transfer.

Process fitBlast Furnace Grab Crane Automation Solution
EquipmentQZ Intelligent Grab Double-Girder Crane / Double-Girder Grab Overhead Crane
ProjectGuangxi Chiji blast-furnace project
Technical reviewCustomer load and site drawings
SPECIFICATION FOR YOUR SITE

Define the operating brief before fixing a crane model.

Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.

InputInformation needed for this applicationConfirm in the technical offer
01 / Load and attachmentBulk material and grab volumeRated load including the attachment, lifting-point arrangement and load cases.
02 / Plant geometryBay plan and receiving pointsCrane span, lifting height, headroom, wheel loads and runway or foundation interfaces.
03 / Environmental conditionsTemperature, humidity and mist conditionsPermitted ambient conditions, radiant heat, humidity and mist exposure, equipment protection and sensor visibility limits for the selected package.
04 / Environment and controlsRemote operation and fallback sequenceProtection, positioning, interlocks, monitoring and safe recovery requirements.
Destination and deliveryCountry, project standards, quantity, freight and site services.Documents, inspection and testing, packing, installation support and agreed delivery milestones.
Have a preliminary layout?

Send the available load schedule and drawings. The missing inputs can be identified during technical review.

Discuss your project ↗
FROM OFFER TO HANDOVER

Compare the complete lifting package.

The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.

01

Engineering

General arrangement, load basis, runway and utility interfaces, control and protection schedule.

02

Manufacture & inspection

Approved drawings, inspection plan and factory testing for the selected configuration.

03

Shipping & site work

Packing, freight, erection support, commissioning and operator training as specified.

04

Handover

Test records, manuals, maintenance instructions and agreed spare-parts list.

Order quantity, compliance and delivery schedule

Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.

RELATED CRANES AND SOLUTIONS

Compare equipment for this operating task.

These product families and related applications provide a starting point. Final selection follows the load and site review.

BUYER QUESTIONS

Before you request a quotation.

What information is needed to specify this crane solution?

Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.

Can the crane be customized for our plant?

Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.

What are the order quantity, certification and lead time?

We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.

LET'S REVIEW YOUR PROJECT

Send the blast furnace grab crane automation brief. Get a crane proposal built around your process.

Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.

Send your project requirements ↗