Skip to content
HENAN MINE CRANEIndustrial lifting systems Request a quote
HENAN MINE CRANE / GRAB OVERHEAD CRANES

Grab-and-Hook Overhead Crane

Use one bridge for loose material and conventional lifts.

QEN combines grab handling with hook lifting for facilities that alternate between bulk cargo and equipment or packaged loads. Select the lifting arrangement, grab volume and control method around the way your operators change tasks.

QENModel designationProject-matchedRated load selection
QEN grab and hook double girder overhead cranePRODUCT CONFIGURATION / QEN
THE LIFTING TASK

Designed for your handling path.

QEN combines grab handling with hook lifting for facilities that alternate between bulk cargo and equipment or packaged loads. Select the lifting arrangement, grab volume and control method around the way your operators change tasks.

01 / APPLICATION

Where it fits

Bulk material loading plus maintenance, equipment or packaged-load lifts in the same bay.

02 / EQUIPMENT

Crane arrangement

Double-girder bridge with grab and hook functions.

MODEL QEN

Technical configuration

Size the crane against the load, installation geometry and work cycle. The final equipment schedule follows the project drawings and operating brief.

Rated capacity5/5–16/16 t configurations
Crane span10.5–50 m
Lifting height20–26 m
Duty classA6–A8
Hoisting speedHook lifting 40–42 m/min
Bridge / structureDouble-girder bridge with grab and hook functions
Power reference380 V, 50 Hz, 3-phase in listed configurations
ControlVariable-frequency control options
Protection / markingGrab volume 0.75–5.2 m³ in listed configurations
Runway and building interfaceCheck runway geometry, wheel loads and building reactions
Hook approach and clearanceConfirm required lifting envelope against the site drawings
BUYER'S SELECTION GUIDE

Specify the crane around the job.

Bulk material loading plus maintenance, equipment or packaged-load lifts in the same bay.

Compare the Grab Overhead Cranes range ↗
01

Load and lifting attachment

Share the maximum lifted mass, load dimensions, center of gravity and any grab, magnet, spreader or lifting beam.

02

Runway and building interface

Confirm runway centers, wheel loads, building clearances and hook approaches.

03

Duty and controls

State typical load, lifts per hour, travel distance, shifts, control position and site power supply.

04

Model-specific check

Confirm whether grab and hook duties share a route, the heaviest load for each, and the time between task changes.

TALK TO OUR ENGINEERS

Get a QEN crane proposal.

Send the load schedule and site drawings. We can configure the crane, lifting system and installation interface for your operating conditions.

Request a technical proposal ↗
  • Maximum lifted load and attachment
  • Span, travel length and available clearances
  • Daily lifting cycle and control choice
  • Power supply, environment and destination