When should I choose QEN instead of a dedicated QZ grab crane?
Compare QEN when the same bay needs conventional hook lifting as well as bulk handling. Its hook positions, grab and lifting mechanisms are selected around both tasks. QZ is the dedicated four-rope grab alternative where bulk transfer is the main job. Provide task frequency and operating cycles so the useful arrangement and duty can be compared.
Does every QEN use a detachable hydraulic grab?
The grab type, drive and lifting layout belong to the selected QEN arrangement. A detachable hydraulic-grab configuration is an available option. If selected, its hydraulic drive, power, connection, controls, attachment parking and changeover procedure must be identified in the technical offer.
How much bulk material will the bucket carry?
Material payload is limited by both the usable bucket volume under actual filling conditions and the permitted suspended load after grab and other attachment weight. Provide bulk-density range, particle size, moisture and the required scoop load. The proposal can then state grab volume, tare, useful material payload and the complete suspended load separately.
How is the hook-mode rating selected?
Include the workpiece, rigging and other lifting attachments in the hook load. Give dimensions, centre of gravity, lifting points, pickup and landing levels and the operating cycle. The selected lifting arrangement defines the permitted rating, speeds and coverage for that hook task; it does not follow automatically from the grab payload.
Can the hook and grab carry loads at the same time?
Do not infer simultaneous-load operation or add capacities from the hook-and-grab description. State any such requirement explicitly. The approved arrangement must define the permitted combined load case, total limits, working positions, operating sequence and controls before that operation is allowed.
What changes for wet, sticky or abrasive material?
These conditions affect how the grab fills, closes and releases, as well as its wear requirements. Send density, moisture, lump size, abrasiveness and material temperature for the full range you handle. Select shell geometry, opening space and wear parts with that information, and agree a representative material trial where required.
How do we specify duty and required output for two tasks?
Describe the complete grab cycle from pickup and closing through discharge and return, including waiting time and shifts. Add the load pattern, route and frequency of hook lifts. Useful scoop load and available handling time affect output. The combined work schedule determines the required motion and duty selection; a grab volume alone does not establish tonnes per hour.
What should purchasing confirm before accepting QEN?
Confirm the supplied mechanisms and grab package, separate load cases, drawings, attachment services and agreed factory and site checks. Include grab closing and discharge, limits, mode functions and any detachable-attachment changeover. Define test material and records, installation and training responsibilities, warranty terms and the recommended crane and grab wear spares.