Skip to content
CRANE MANUFACTURER SINCE 2002
info@hnksglobal.com+86 188 3620 7779Project enquiry ↗
Henan Mine Crane Request a quote
Photo from Automated Handling Solutions for the Electric Power Industry
POWER & HYDRO / LIFTING SOLUTIONS

Automated Power Cable Warehouse Handling Solution

Power projects store cable and other electrical items with changing locations, so an automated crane must know both the load and its destination.

Henan Mine Crane equipment for Electrical equipment warehouse project

THE LIFTING SOLUTION

Identify, lift and trace electrical materials without manual travel.

Power projects store cable and other electrical items with changing locations, so an automated crane must know both the load and its destination.

Connect a scanning-equipped crane to WCS dispatch and WMS inventory records. Position feedback, intelligent lifting gear, obstacle detection and anti-sway allow each pickup and release to be logged and supervised from the control room.

HANDLING SEQUENCE

How the solution works.

Follow the load through the operation to see where lifting equipment, tooling and controls must work together.

01

Identify the item

Use scanning and visual checks to match a load with its warehouse record.

02

Execute the lift

Engage the monitored attachment and follow the assigned route with obstacle checks.

03

Close the task

Confirm placement and write the movement to the inventory system.

ENGINEERING DECISIONS

What determines the final configuration?

These choices affect safety, process fit and the operating life of the installation.

01

Data integrity

Define how load identity, position and exception states pass between crane, WCS and WMS.

02

Attachment verification

Test the detection switch and release logic with actual cable packages.

DELIVERED PROJECTS

Experience on real jobs.

See how cranes and lifting systems were configured for demanding operating environments.

Photo from Automated Handling Solutions for the Electric Power Industry
PROJECT 01

Electrical equipment warehouse project

The project used two automated cranes for a power project handling cables for box-type substations, using PLC control, 3D scanning, visual detection, WCS scheduling and WMS records.

RELEVANT EQUIPMENT

Equipment options for this solution.

These product families support the handling tasks above. The final crane and attachment are selected from the site brief.

SPECIFICATION BRIEF

What we need to size your crane.

Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.

Prepare your enquiry ↗
  1. 01Cable package dimensions and mass
  2. 02Storage and vehicle layout
  3. 03Inventory and WCS/WMS interfaces
  4. 04Obstacle, sway and release rules
NEXT STEP

Tell us what your crane needs to lift.

Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.

Start a project enquiry ↗