Unit and rigging weight
Underground Pump Station Unit Installation
Underground station construction restricts headroom and access while heavy equipment must be moved precisely to its installation position.

Start with the component and the lift route.
Underground station construction restricts headroom and access while heavy equipment must be moved precisely to its installation position.
The lifted component, rigging, building clearances and control sequence need to be reviewed as one operating system.
Prepare the technical brief ↗Delivery opening and hall sections
Multi-point lifting arrangement
Low-speed control and fault reporting
Place heavy pump units inside a constrained underground hall.
Configure bridge cranes around the delivery opening, runway elevation and equipment centerline. Multi-point lift balance, low-speed torque and fault monitoring help the team install and later service the units.

Receive the unit
Check the opening, transport frame and lift point arrangement.
Traverse the hall
Keep multiple pickup points balanced through the underground route.
Lower to position
Use controlled low-speed movement and confirm the final support.
Low-speed force
Confirm drive torque and braking while lowering the heaviest assembly.
Fault visibility
Provide status, protective signals and recorded alarms to maintenance staff.
National water-conservancy pump station
The underground pump-station project used a 125 t bridge crane and other units with PLC and variable-frequency control, multi-point synchronization and fault diagnostics.




Define the operating brief before fixing a crane model.
Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.
| Input | Information needed for this application | Confirm in the technical offer |
|---|---|---|
| 01 / Site requirement | Unit and rigging weight | Rated load including the attachment, lifting-point arrangement and load cases. |
| 02 / Site requirement | Delivery opening and hall sections | Crane span, lifting height, headroom, wheel loads and runway or foundation interfaces. |
| 03 / Site requirement | Multi-point lifting arrangement | Lifting-point positions, load shares, synchronization method, permitted combined motions and recovery procedure defined for the selected unit and rigging. |
| 04 / Site requirement | Low-speed control and fault reporting | Low-speed torque, braking and stopping behaviour, fault signals, recorded alarms and the agreed safe recovery response. |
| Destination and delivery | Country, project standards, quantity, freight and site services. | Documents, inspection and testing, packing, installation support and agreed delivery milestones. |
Send the available load schedule and drawings. The missing inputs can be identified during technical review.
Discuss your project ↗Compare the complete lifting package.
The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.
Engineering
General arrangement, load basis, runway and utility interfaces, control and protection schedule.
Manufacture & inspection
Approved drawings, inspection plan and factory testing for the selected configuration.
Shipping & site work
Packing, freight, erection support, commissioning and operator training as specified.
Handover
Test records, manuals, maintenance instructions and agreed spare-parts list.
Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.
Compare equipment for this operating task.
These product families and related applications provide a starting point. Final selection follows the load and site review.
Before you request a quotation.
What information is needed to specify this crane solution?
Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.
Can the crane be configured for our powerhouse or factory?
Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.
What are the order quantity, certification and lead time?
We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.
Send your project brief. Get a crane proposal built around your process.
Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.
Send your project requirements ↗
























