Receive the unit
Check the opening, transport frame and lift point arrangement.
Underground station construction restricts headroom and access while heavy equipment must be moved precisely to its installation position.
Henan Mine Crane equipment for National water-conservancy pump station
Underground station construction restricts headroom and access while heavy equipment must be moved precisely to its installation position.
Configure bridge cranes around the delivery opening, runway elevation and equipment centerline. Multi-point lift balance, low-speed torque and fault monitoring help the team install and later service the units.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Check the opening, transport frame and lift point arrangement.
Keep multiple pickup points balanced through the underground route.
Use controlled low-speed movement and confirm the final support.
These choices affect safety, process fit and the operating life of the installation.
Confirm drive torque and braking while lowering the heaviest assembly.
Provide status, protective signals and recorded alarms to maintenance staff.
See how cranes and lifting systems were configured for demanding operating environments.

The underground pump-station project used a 125 t bridge crane and other units with PLC and variable-frequency control, multi-point synchronization and fault diagnostics.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗