Skip to content
CRANE MANUFACTURER SINCE 2002
info@hnksglobal.com+86 188 3620 7779Project enquiry ↗
Henan Mine Crane Request a quote
Crane application in hydropower and energy from Henan Mine Crane's hydropower and energy application case
POWER & HYDRO / LIFTING SOLUTIONS

Underground Pump Station Unit Installation Solution

Underground station construction restricts headroom and access while heavy equipment must be moved precisely to its installation position.

Henan Mine Crane equipment for National water-conservancy pump station

THE LIFTING SOLUTION

Place heavy pump units inside a constrained underground hall.

Underground station construction restricts headroom and access while heavy equipment must be moved precisely to its installation position.

Configure bridge cranes around the delivery opening, runway elevation and equipment centerline. Multi-point lift balance, low-speed torque and fault monitoring help the team install and later service the units.

HANDLING SEQUENCE

How the solution works.

Follow the load through the operation to see where lifting equipment, tooling and controls must work together.

01

Receive the unit

Check the opening, transport frame and lift point arrangement.

02

Traverse the hall

Keep multiple pickup points balanced through the underground route.

03

Lower to position

Use controlled low-speed movement and confirm the final support.

ENGINEERING DECISIONS

What determines the final configuration?

These choices affect safety, process fit and the operating life of the installation.

01

Low-speed force

Confirm drive torque and braking while lowering the heaviest assembly.

02

Fault visibility

Provide status, protective signals and recorded alarms to maintenance staff.

DELIVERED PROJECTS

Experience on real jobs.

See how cranes and lifting systems were configured for demanding operating environments.

Crane application in hydropower and energy from Henan Mine Crane's hydropower and energy application case
PROJECT 01

National water-conservancy pump station

The underground pump-station project used a 125 t bridge crane and other units with PLC and variable-frequency control, multi-point synchronization and fault diagnostics.

RELEVANT EQUIPMENT

Equipment options for this solution.

These product families support the handling tasks above. The final crane and attachment are selected from the site brief.

SPECIFICATION BRIEF

What we need to size your crane.

Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.

Prepare your enquiry ↗
  1. 01Unit and rigging weight
  2. 02Delivery opening and hall sections
  3. 03Multi-point lifting arrangement
  4. 04Low-speed control and fault reporting
NEXT STEP

Tell us what your crane needs to lift.

Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.

Start a project enquiry ↗