Skip to content
CRANE MANUFACTURER SINCE 2002
info@hnksglobal.com+86 188 3620 7779Project enquiry ↗
Henan Mine Crane Request a quote
Crane application in hydropower and energy from Henan Mine Crane's hydropower and energy application case
POWER & HYDRO / LIFTING SOLUTIONS

500 t Offshore Wind Component Assembly Solution

A large offshore wind facility needs high-capacity handling that maintains the component's attitude while moving between production stations.

Henan Mine Crane equipment for Offshore wind energy project

THE LIFTING SOLUTION

Move extra-heavy wind components through a repeatable factory route.

A large offshore wind facility needs high-capacity handling that maintains the component's attitude while moving between production stations.

Use a 500 t double-trolley bridge-crane plan for the heaviest assemblies and coordinate it with the rest of the plant fleet. Synchronize hooks, select fast and slow travel ranges, and use anti-sway and visual monitoring for station hand-offs.

HANDLING SEQUENCE

How the solution works.

Follow the load through the operation to see where lifting equipment, tooling and controls must work together.

01

Prepare the rigging

Confirm component mass, lift points and center of gravity.

02

Travel between stations

Coordinate the two trolleys and monitor load balance.

03

Seat at the fixture

Slow the movement for precise placement and inspect the next lift path.

ENGINEERING DECISIONS

What determines the final configuration?

These choices affect safety, process fit and the operating life of the installation.

01

Fleet coverage

Make sure the 500 t unit and smaller cranes serve complementary work areas.

02

Safety monitoring

Specify protection and recording for heavy lifts and frequent operation.

DELIVERED PROJECTS

Experience on real jobs.

See how cranes and lifting systems were configured for demanding operating environments.

Crane application in hydropower and energy from Henan Mine Crane's hydropower and energy application case
PROJECT 01

Offshore wind energy project

The project used a 500 t double-trolley bridge crane installed and operating at an offshore wind project; the first project phase included 43 lifting systems.

RELEVANT EQUIPMENT

Equipment options for this solution.

These product families support the handling tasks above. The final crane and attachment are selected from the site brief.

SPECIFICATION BRIEF

What we need to size your crane.

Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.

Prepare your enquiry ↗
  1. 01Heaviest assembly and rigging
  2. 02Lift height and trolley spacing
  3. 03Assembly route and fixture locations
  4. 04Monitoring and availability target
NEXT STEP

Tell us what your crane needs to lift.

Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.

Start a project enquiry ↗