Receive the block or part
Verify weight, lift points and staging at the shipyard.
Cruise-ship construction joins large blocks and numerous smaller systems, requiring careful crane coverage and hand-offs between trades.
Henan Mine Crane equipment for First domestically built large cruise ship
Cruise-ship construction joins large blocks and numerous smaller systems, requiring careful crane coverage and hand-offs between trades.
Allocate cranes to the shipbuilding production stages from block transport through outfitting. Match attachments and controlled travel to component geometry while reserving access for surrounding assembly work.
Follow the load through the operation to see where lifting equipment, tooling and controls must work together.
Verify weight, lift points and staging at the shipyard.
Coordinate crane travel with adjacent crews and structures.
Confirm fit-up support and the next work team's access.
These choices affect safety, process fit and the operating life of the installation.
Separate heavy blocks from delicate equipment lifts in the schedule.
Plan exclusion areas and crane conflicts across trades.
See how cranes and lifting systems were configured for demanding operating environments.

Henan Mine Crane supplied 12 cranes of various types for the final assembly phase of China's first domestically built large cruise ship.
These product families support the handling tasks above. The final crane and attachment are selected from the site brief.
Send the operating brief and the relevant layout drawings. The resulting proposal can address capacity, geometry, duty, controls, installation interface and safety requirements as one system.
Prepare your enquiry ↗Start with a load schedule and site plan. Our team can help develop the matched crane arrangement and technical scope.
Start a project enquiry ↗