CONSTRUCTION CRANE SOLUTIONS

700 t Bridge Steel Tower Gantry

A suspension-bridge steel tower calls for very heavy segment lifting while the construction site and temporary works constrain runway position and lift height.

ApplicationZhangjinggao Yangtze River Bridge steel tower
Project equipmentBuilt for this handling task
Site-specificLoad, route, duty and delivery scope
Heavy gantry crane installation for bridge steel tower construction
Heavy gantry crane installation for bridge steel tower construction.
THE OPERATING CHALLENGE

Start with the load and the process route.

A suspension-bridge steel tower calls for very heavy segment lifting while the construction site and temporary works constrain runway position and lift height.

The load, lifting attachment, building interface and operating sequence need to be reviewed together.

Prepare the technical brief ↗
01 / DEFINE

Maximum segment and rigging mass

02 / DEFINE

Tower erection sequence

03 / DEFINE

Runway foundations and span

04 / DEFINE

Wind and high-lift operating plan

ENGINEERED FOR THE APPLICATION

Lift and place large steel-tower sections with a matched site gantry.

Plan the 700 t gantry from the largest tower segment, staging area and erection sequence. Coordinate span, high lift, wheel loads and wind operating limits with the civil and installation teams.

Heavy gantry crane installation for bridge steel tower construction
Heavy gantry crane installation for bridge steel tower construction.
01

Stage the segment

Set pickup points and supports in the fabrication or laydown zone.

02

Travel to the tower

Check gantry path against temporary works and exclusion areas.

03

Place under control

Align the segment with the erected structure and confirm support.

✓

Civil interface

Verify rail foundations and wheel loads at each stage of construction.

✓

Wind and height

Define safe operating limits for tall, exposed lifts.

PROJECT REFERENCE

Zhangjinggao Yangtze River Bridge steel tower

The project used a 700 t gantry crane that passed type testing for the Zhangjinggao bridge project and was intended for main steel-tower structure lifting.

Process fit700 t Bridge Steel Tower Gantry Solution
Equipment
ProjectZhangjinggao Yangtze River Bridge steel tower
Technical reviewCustomer load and site drawings
SPECIFICATION FOR YOUR SITE

Define the operating brief before fixing a crane model.

Project figures above describe a delivered application. Your crane rating, dimensions, controls and documentation follow the approved site brief.

InputInformation needed for this applicationConfirm in the technical offer
01 / Site requirementMaximum segment and rigging massRated load including the attachment, lifting-point arrangement and load cases.
02 / Site requirementTower erection sequenceLift sequence, pickup and placement positions, staging areas and clearance at each construction stage.
03 / Site requirementRunway foundations and spanRail gauge and alignment, wheel reactions, foundation design loads, span and the agreed civil interfaces.
04 / Site requirementWind and high-lift operating planOperating and parked wind limits, storm restraint, lifting-height limits and the agreed high-lift procedure.
Destination and deliveryCountry, project standards, quantity, freight and site services.Documents, inspection and testing, packing, installation support and agreed delivery milestones.
Have a preliminary layout?

Send the available load schedule and drawings. The missing inputs can be identified during technical review.

Discuss your project ↗
FROM OFFER TO HANDOVER

Compare the complete lifting package.

The offer should state the equipment boundary, documents, inspections and site responsibilities for your destination.

01

Engineering

General arrangement, load basis, runway and utility interfaces, control and protection schedule.

02

Manufacture & inspection

Approved drawings, inspection plan and factory testing for the selected configuration.

03

Shipping & site work

Packing, freight, erection support, commissioning and operator training as specified.

04

Handover

Test records, manuals, maintenance instructions and agreed spare-parts list.

Order quantity, compliance and delivery schedule

Single-crane and multi-crane packages are available. Your quotation defines the destination standards, required certificates and inspection records, packing, site services and production schedule after drawing approval.

RELATED CRANES AND SOLUTIONS

Compare equipment for this operating task.

These product families and related applications provide a starting point. Final selection follows the load and site review.

BUYER QUESTIONS

Before you request a quotation.

What information is needed to specify this crane solution?

Send the full load and lifting-gear mass, route or bay drawing, operating cycles, working environment, controls and destination requirements.

Can the crane system be configured for our site and process?

Yes. The equipment arrangement, attachment and controls are selected for the approved load, route, runway and process conditions.

What are the order quantity, certification and lead time?

We can quote a single crane or a coordinated fleet. The project offer states the agreed destination standards, inspection and test documents, manufacturing schedule after drawing approval, and shipping or site-service scope.

LET'S REVIEW YOUR PROJECT

Send your project brief. Get a crane proposal built around your process.

Share your load, layout, work cycle and destination. Our team can review the crane, lifting attachment and delivery scope together.