| Period | April 2025 Quality Month |
| Activity | Practical welding competition |
| Assessment team | Process and quality specialists |
Practical work across welding positions
Participants used their workshop experience on tasks involving different welding positions, including flat and overhead work. Robotic welding lines continued operating alongside the competition activities.
The event connected individual skills assessment with the fabrication work used in crane manufacturing.
Process and quality teams review the results
The assessment team examined weld appearance and the structural-quality requirements of the tasks. Results were considered together with participants’ routine quality control and work performance for recognition.
The competition formed part of a wider programme of training and manufacturing review during Quality Month.
Agree fabrication checks for a crane order
Customer inspection requirements should identify the relevant fabricated components, witness points and records. These requirements can be included in the technical order so the manufacturing and acceptance teams share the same review scope.























