| Team leader | Wei Changxin |
| Team size | More than seventy |
| Work areas | Electrical cabinets and associated crane components |
| Profile period | June 2022 |
Team combines checks with technical discussion
The team uses self-checks, peer checks and specialist inspections to review work and address identified hazards. Pre-shift reminders, technical exchanges and post-work reviews form part of its routine.
Component work includes operator and electrical arrangements
The team has made cabinets, operator cabins, water tanks, oil trays, insulated cable channels and ventilation ducts for projects including Baosteel, Baowu and Shaogang.
Its development work includes changes to cabin layout and manufacturing methods. These tasks connect component quality with the intended crane operating arrangement.

