| Programme period | April 2022 |
| Topics | Coating, loading protection and process inspection |
| Participants | Production, process and quality teams |
Coating and loading protection receive separate reviews
The process department trained double-girder crane coating personnel and single-girder teams responsible for loading protection. These tasks address the finished surface and the condition of equipment during dispatch.
Inspection training follows the manufacturing sequence
Quality personnel reviewed examples from workshop processes. Weekly reviews examined selected production stages, while safety teams delivered pre-shift training and technical personnel provided crane-knowledge sessions.
For a new order, specify coating requirements, packing and transport protection, and the records required at factory release. Those requirements should be aligned with the destination environment and shipping route.























