Programme periodApril 2022
TopicsCoating, loading protection and process inspection
ParticipantsProduction, process and quality teams

Coating and loading protection receive separate reviews

The process department trained double-girder crane coating personnel and single-girder teams responsible for loading protection. These tasks address the finished surface and the condition of equipment during dispatch.

Inspection training follows the manufacturing sequence

Quality personnel reviewed examples from workshop processes. Weekly reviews examined selected production stages, while safety teams delivered pre-shift training and technical personnel provided crane-knowledge sessions.

For a new order, specify coating requirements, packing and transport protection, and the records required at factory release. Those requirements should be aligned with the destination environment and shipping route.